Barracks Hvac Upgrade - Combination Bunks RFP
Posted
Sep 14, 2026
Oct 27, 2026
Work includes : replace two (2) existing gas fired make-up air units on the roof that serve the barracks spaces with new rooftop units. Connect to the existing ductwork with some duct modifications; replace one (1) rooftop unit on the roof that serves the control bubble with a split system air conditioning unit, associated refrigerant piping, and ductwork with electric heat; see attached file.
