Discover opportunities months before the RFP drops
Learn more →Search pipeline RFP opportunities from state pipeline safety agencies, utility commissions, and energy departments. Find solicitations for pipeline construction, maintenance, and pipeline safety services updated daily.
The work consists of furnishing one fully crewed and equipped hydraulic pipeline cutterhead dredge. Work will be performed in the New Orleans Harbor Reach of the Mississippi River and adjacent lock forebays of the Gulf Intracoastal Waterway.
Posted Date
Apr 22, 2025
Due Date
Apr 21, 2027
Release: Apr 22, 2025
Close: Apr 21, 2027
The work consists of furnishing one fully crewed and equipped hydraulic pipeline cutterhead dredge. Work will be performed in the New Orleans Harbor Reach of the Mississippi River and adjacent lock forebays of the Gulf Intracoastal Waterway.
AvailableThe general work consists of providing on-call supplemental water/sewer/recycled/general infrastructure maintenance and repair services to support the District's pipeline repair, maintenance, and emergency work. Tasks may include, but are not limited to: pipeline, valve, vault, and air-vac relocations; leak repairs; valve installations; storm drain relocations; and concrete and asphalt demolition/repairs, along with other work. Project duration: initial term of one (1) year with four (4) one-year optional renewal terms.
Posted Date
Dec 11, 2025
Due Date
Jan 14, 2026
Release: Dec 11, 2025
Close: Jan 14, 2026
The general work consists of providing on-call supplemental water/sewer/recycled/general infrastructure maintenance and repair services to support the District's pipeline repair, maintenance, and emergency work. Tasks may include, but are not limited to: pipeline, valve, vault, and air-vac relocations; leak repairs; valve installations; storm drain relocations; and concrete and asphalt demolition/repairs, along with other work. Project duration: initial term of one (1) year with four (4) one-year optional renewal terms.
AvailableWork includes furnishing and installing 280' of 14" dia highstrength low-alloy (hsla) schedule 40 column pipe and appurtenances, and column check valve; conduct well disinfection and water quality analysis; construct hot tap connection to the existing well connection main; 40 LF of 12" dip mortar lined and coated pipeline; 12' high cmu wall; testing existing fiber optic cable; 1,100 SF of 12" dip mortar lined and coated pipeline. See attached files.
Posted Date
Dec 23, 2025
Due Date
Jan 23, 2026
Release: Dec 23, 2025
Close: Jan 23, 2026
Work includes furnishing and installing 280' of 14" dia highstrength low-alloy (hsla) schedule 40 column pipe and appurtenances, and column check valve; conduct well disinfection and water quality analysis; construct hot tap connection to the existing well connection main; 40 LF of 12" dip mortar lined and coated pipeline; 12' high cmu wall; testing existing fiber optic cable; 1,100 SF of 12" dip mortar lined and coated pipeline. See attached files.
AvailableAsphalt and concrete restoration IDIQ contract will (1) restore temporary patches placed by Austin Water in-house crews after the completion of water and wastewater pipeline CIP renewals or Travis County ETJ repairs and (2) implement paving upgrades on an as-needed basis at AW facilities.
Posted Date
Dec 25, 2025
Due Date
Jan 15, 2026
Release: Dec 25, 2025
Close: Jan 15, 2026
Asphalt and concrete restoration IDIQ contract will (1) restore temporary patches placed by Austin Water in-house crews after the completion of water and wastewater pipeline CIP renewals or Travis County ETJ repairs and (2) implement paving upgrades on an as-needed basis at AW facilities.
AvailableFurnish and install a reliable, frost-free cattle watering system connected to an existing well and pressure tank. The project scope includes the installation of 4,300 ft of 1.5IN HDPE pipeline, seven Johnson J480 frost-free water tanks, and two frost-proof hydrants.
Posted Date
Jan 4, 2026
Due Date
Jan 16, 2026
Release: Jan 4, 2026
Close: Jan 16, 2026
Furnish and install a reliable, frost-free cattle watering system connected to an existing well and pressure tank. The project scope includes the installation of 4,300 ft of 1.5IN HDPE pipeline, seven Johnson J480 frost-free water tanks, and two frost-proof hydrants.
AvailableThe work consists of the dredging and disposal of material from the Tiger Pass Ship Channel. Approx. 2.25 million CY of material will be dredged from the channel to restore navigation. The dredged material will be disposed of via pipeline into disposal sites specified in the Plans and Specifications. All disposal sites will be single point discharge. The work consists of the dredging and disposal of material from the Tiger Pass Ship Channel. Approx. 2.25 million CY of material will be dredged from the channel to restore navigation. The dredged material will be disposed of via pipeline into disposal sites specified in the Plans and Specifications. All disposal sites will be single point discharge.
Posted Date
Jul 16, 2025
Due Date
Jul 16, 2027
Release: Jul 16, 2025
Close: Jul 16, 2027
The work consists of the dredging and disposal of material from the Tiger Pass Ship Channel. Approx. 2.25 million CY of material will be dredged from the channel to restore navigation. The dredged material will be disposed of via pipeline into disposal sites specified in the Plans and Specifications. All disposal sites will be single point discharge. The work consists of the dredging and disposal of material from the Tiger Pass Ship Channel. Approx. 2.25 million CY of material will be dredged from the channel to restore navigation. The dredged material will be disposed of via pipeline into disposal sites specified in the Plans and Specifications. All disposal sites will be single point discharge.
AvailablePerform emergency, critical preventative maintenance, planned, and/or as needed on-call construction services for water and wastewater system projects within the water authority service area. Typical projects may include, but are not limited to, pipeline installation and rehabilitation as well as plant and facilities. Pipeline projects may be new construction, slip lining, cured-in-place pipe, point repair and/or replacement of small and large diameter interceptor sewer lines, repair and/or replacement of small and large diameter water lines, fire hydrants, concrete (formed or pre-cast) meter and valve vaults, temporary service connections, valves, manhole replacement or rehabilitation, bypass pumping and other related work.
Posted Date
Dec 28, 2025
Due Date
Feb 11, 2026
Release: Dec 28, 2025
Close: Feb 11, 2026
Perform emergency, critical preventative maintenance, planned, and/or as needed on-call construction services for water and wastewater system projects within the water authority service area. Typical projects may include, but are not limited to, pipeline installation and rehabilitation as well as plant and facilities. Pipeline projects may be new construction, slip lining, cured-in-place pipe, point repair and/or replacement of small and large diameter interceptor sewer lines, repair and/or replacement of small and large diameter water lines, fire hydrants, concrete (formed or pre-cast) meter and valve vaults, temporary service connections, valves, manhole replacement or rehabilitation, bypass pumping and other related work.
AvailableProvide construction management at risk (cmar) services to assist rwrd to enter into construction contracts to build the water system improvement program consisting of a surface water intake, tunnel, raw water pump station, raw water transmission pipeline, water treatment plant, and potable water transmission.
Posted Date
Nov 26, 2025
Due Date
Feb 5, 2026
Release: Nov 26, 2025
Close: Feb 5, 2026
Provide construction management at risk (cmar) services to assist rwrd to enter into construction contracts to build the water system improvement program consisting of a surface water intake, tunnel, raw water pump station, raw water transmission pipeline, water treatment plant, and potable water transmission.
AvailableHydraulic Dredging approximately 310,000 cubic yards of sediment from Bancroft Channel and East Main Bay of Fountain Lake, and potentially an addition of 240,000 cubic yards of sediment from North (Bancroft) Bay (approximately 550,000 cubic yards total), inclusive of pipeline transport, placement of Dredge material at constructed upland confined disposal facility (CDF) and operation and maintenance of the CDF for the life of the Contract.
Posted Date
Nov 24, 2025
Due Date
Jan 16, 2026
Release: Nov 24, 2025
Close: Jan 16, 2026
Hydraulic Dredging approximately 310,000 cubic yards of sediment from Bancroft Channel and East Main Bay of Fountain Lake, and potentially an addition of 240,000 cubic yards of sediment from North (Bancroft) Bay (approximately 550,000 cubic yards total), inclusive of pipeline transport, placement of Dredge material at constructed upland confined disposal facility (CDF) and operation and maintenance of the CDF for the life of the Contract.
AvailableFY26 GIWW Maintenance Dredging. Pipeline maintenance dredging and advanced maintenance dredging of the Bay. Schedule 1 will include GIWW maintenance dredging of approx. 1.5 million cubic yards (CY) of the Bay and will include varying advanced maintenance depths. Material will be placed across various placement areas located along the GIWW. This contract will be subject to several environmental windows, including bird nesting, turtle nesting, and piping plover.
Posted Date
Nov 10, 2025
Due Date
Aug 4, 2026
Release: Nov 10, 2025
Close: Aug 4, 2026
FY26 GIWW Maintenance Dredging. Pipeline maintenance dredging and advanced maintenance dredging of the Bay. Schedule 1 will include GIWW maintenance dredging of approx. 1.5 million cubic yards (CY) of the Bay and will include varying advanced maintenance depths. Material will be placed across various placement areas located along the GIWW. This contract will be subject to several environmental windows, including bird nesting, turtle nesting, and piping plover.
AvailableWork includes connection of two leachate storage tanks to the city's sanitary sewer manhole. Work also includes the installation of a dual-contained high-density polyethylene (HDPE) above-ground and below ground pipeline, pipe restraints and supports, below ground PVC pipe with a connection to the city manhole, fittings, valves, sensors, meters, pumps, control panels/cellular telemetry, connection and improvements to existing storage tanks, underground road crossings and other appurtenances.
Posted Date
Sep 22, 2025
Due Date
Jan 22, 2026
Release: Sep 22, 2025
Close: Jan 22, 2026
Work includes connection of two leachate storage tanks to the city's sanitary sewer manhole. Work also includes the installation of a dual-contained high-density polyethylene (HDPE) above-ground and below ground pipeline, pipe restraints and supports, below ground PVC pipe with a connection to the city manhole, fittings, valves, sensors, meters, pumps, control panels/cellular telemetry, connection and improvements to existing storage tanks, underground road crossings and other appurtenances.
AvailableAqua North Carolina, Inc. seeks bids for the Aqua Wyntree & Willow Hill Well Improvements Project in Cary, North Carolina. The project consists of installing PFAS and iron/manganese filtration at the existing Wyntree well site and constructing a pipeline interconnection between the Wyntree and Willow Hill systems. Bid documents are available via QuestCDN; a pre‑bid conference is scheduled for January 8, 2026, and bids are due January 15, 2026 at 12:00 PM local time.
Posted Date
Dec 22, 2025
Due Date
Jan 15, 2026
Release: Dec 22, 2025
Close: Jan 15, 2026
Aqua North Carolina, Inc. seeks bids for the Aqua Wyntree & Willow Hill Well Improvements Project in Cary, North Carolina. The project consists of installing PFAS and iron/manganese filtration at the existing Wyntree well site and constructing a pipeline interconnection between the Wyntree and Willow Hill systems. Bid documents are available via QuestCDN; a pre‑bid conference is scheduled for January 8, 2026, and bids are due January 15, 2026 at 12:00 PM local time.
AvailableEmerging approaches for curating and sustaining analysis-ready highway transportation datasets through engagement with multi-disciplinary research communities. Methods for enabling and sustaining researcher and practitioner communities of practice around emerging data science techniques for highway transportation. Methods for advancing expertise across data science and highway transportation applications both with current professionals to provide an immediate impact of agency and program performance and with students to create a pipeline of future researchers and practitioners that can exploit emerging capabilities in data science.
Posted Date
Dec 16, 2025
Due Date
Jan 9, 2026
Release: Dec 16, 2025
Close: Jan 9, 2026
Emerging approaches for curating and sustaining analysis-ready highway transportation datasets through engagement with multi-disciplinary research communities. Methods for enabling and sustaining researcher and practitioner communities of practice around emerging data science techniques for highway transportation. Methods for advancing expertise across data science and highway transportation applications both with current professionals to provide an immediate impact of agency and program performance and with students to create a pipeline of future researchers and practitioners that can exploit emerging capabilities in data science.
AvailableWork under this contract may include, but is not limited to: asphalt paving and concrete work related to pipeline relocation and/or installations, asphalt paving and concrete work related to water service lateral and meter box relocation, asphalt paving and concrete work related to unscheduled water main leak repairs, specialty concrete work for water facilities infrastructure, various base paving, final paving, and concrete work, as needed, installation of traffic signal loops. See outside link.
Posted Date
Dec 19, 2025
Due Date
Jan 9, 2026
Release: Dec 19, 2025
Close: Jan 9, 2026
Work under this contract may include, but is not limited to: asphalt paving and concrete work related to pipeline relocation and/or installations, asphalt paving and concrete work related to water service lateral and meter box relocation, asphalt paving and concrete work related to unscheduled water main leak repairs, specialty concrete work for water facilities infrastructure, various base paving, final paving, and concrete work, as needed, installation of traffic signal loops. See outside link.
AvailableThe National Institute on Aging (NIA) seeks input on the early development pipeline for novel, disease-modifying drugs aimed at preventing or treating specific aging-related conditions. Responses from academic and industry stakeholders are requested regarding targets, modalities, development stage, challenges, and needed resources to inform future NIA planning. Submissions are due by July 1, 2026 at 11:59:59 PM Eastern Time via email, and this request is for information only and not a solicitation or grant program.
Posted Date
Dec 23, 2025
Due Date
Jul 2, 2026
Release: Dec 23, 2025
Close: Jul 2, 2026
The National Institute on Aging (NIA) seeks input on the early development pipeline for novel, disease-modifying drugs aimed at preventing or treating specific aging-related conditions. Responses from academic and industry stakeholders are requested regarding targets, modalities, development stage, challenges, and needed resources to inform future NIA planning. Submissions are due by July 1, 2026 at 11:59:59 PM Eastern Time via email, and this request is for information only and not a solicitation or grant program.
AvailableThe project is comprised of hydraulic maintenance or mechanical dredging of Milford Haven Channel, transport of material by pipeline with placement within the beach placement sites, minor site-work of the placement sites and restoration of the adjacent jetty structure as shown in the attached draft drawing and draft specifications. Dredging will include a portion of the authorized channel to a depth of -10 feet mean lower low water (MLLW) and will include 1 foot of allowable overdepth. Jetty work will include the removal of old stone and installation of sheet piles and new stone.
Posted Date
Dec 16, 2025
Due Date
Jan 12, 2026
Release: Dec 16, 2025
Close: Jan 12, 2026
The project is comprised of hydraulic maintenance or mechanical dredging of Milford Haven Channel, transport of material by pipeline with placement within the beach placement sites, minor site-work of the placement sites and restoration of the adjacent jetty structure as shown in the attached draft drawing and draft specifications. Dredging will include a portion of the authorized channel to a depth of -10 feet mean lower low water (MLLW) and will include 1 foot of allowable overdepth. Jetty work will include the removal of old stone and installation of sheet piles and new stone.
AvailableReplace the generation capacity of existing scattergood units 1 and 2, which are conventional natural-gas-fired steam-boiler generators that would be removed from service, with a ccgs capable of operating on a fuel mixture of natural gas and a minimum of 30 percent hydrogen by volume. The proposed ccgs would consist of a combustion-turbine generator and a steam-turbine generator operating in tandem. Additional facilities or ancillary functions required to support the proposed ccgs include, but are not limited to, an air-cooled condenser, wet-surface air cooler, gas compressors, switchyard upgrades, and a dedicated pipeline for industrial wastewater discharge.
Posted Date
Nov 13, 2024
Due Date
Jan 23, 2026
Release: Nov 13, 2024
Close: Jan 23, 2026
Replace the generation capacity of existing scattergood units 1 and 2, which are conventional natural-gas-fired steam-boiler generators that would be removed from service, with a ccgs capable of operating on a fuel mixture of natural gas and a minimum of 30 percent hydrogen by volume. The proposed ccgs would consist of a combustion-turbine generator and a steam-turbine generator operating in tandem. Additional facilities or ancillary functions required to support the proposed ccgs include, but are not limited to, an air-cooled condenser, wet-surface air cooler, gas compressors, switchyard upgrades, and a dedicated pipeline for industrial wastewater discharge.
AvailableThe City of Bend invites sealed bids for the King Hezekiah and Fargo Sewer Project (Project No. 1SN09), consisting of trenching and installation of approximately 2,914 linear feet of 8-inch gravity sewer pipeline, manholes, laterals, traffic control, street reconstruction, and right-of-way restoration. The engineer’s estimate is $2,000,000–$2,500,000 and project funding is provided through the Oregon DEQ Clean Water State Revolving Fund (CWSRF) loan program. Bids are submitted electronically through the City of Bend’s Bonfire eProcurement portal and the official posting includes the ITB document, bid forms, project drawings, and CWSRF forms.
Posted Date
Jan 5, 2026
Due Date
Feb 3, 2026
Release: Jan 5, 2026
Close: Feb 3, 2026
The City of Bend invites sealed bids for the King Hezekiah and Fargo Sewer Project (Project No. 1SN09), consisting of trenching and installation of approximately 2,914 linear feet of 8-inch gravity sewer pipeline, manholes, laterals, traffic control, street reconstruction, and right-of-way restoration. The engineer’s estimate is $2,000,000–$2,500,000 and project funding is provided through the Oregon DEQ Clean Water State Revolving Fund (CWSRF) loan program. Bids are submitted electronically through the City of Bend’s Bonfire eProcurement portal and the official posting includes the ITB document, bid forms, project drawings, and CWSRF forms.
AvailableThe Glynn County Board of Commissioners is soliciting proposals to perform a comprehensive Hazardous Materials Commodity Flow Study (HMCFS) to identify and analyze types, volumes, and transportation patterns of hazardous materials moving into, out of, and through Glynn County across roadway, railway, waterway, and pipeline systems. The study will use nationally recognized methodologies and validated, data-driven analysis to provide insights that enhance emergency planning, response, and risk reduction for the county's transportation corridors and critical infrastructure. The contract is for professional services with an estimated value range of $50,000–$200,000 and a response deadline of 2026-02-11.
Posted Date
Jan 6, 2026
Due Date
Feb 11, 2026
Release: Jan 6, 2026
Close: Feb 11, 2026
The Glynn County Board of Commissioners is soliciting proposals to perform a comprehensive Hazardous Materials Commodity Flow Study (HMCFS) to identify and analyze types, volumes, and transportation patterns of hazardous materials moving into, out of, and through Glynn County across roadway, railway, waterway, and pipeline systems. The study will use nationally recognized methodologies and validated, data-driven analysis to provide insights that enhance emergency planning, response, and risk reduction for the county's transportation corridors and critical infrastructure. The contract is for professional services with an estimated value range of $50,000–$200,000 and a response deadline of 2026-02-11.
AvailableSeeks proposals from qualified firms or individuals with horizontal and vertical public works experience to finalize an exclusive agreement to provide professional services in developing and administering a small contractor development program (scdp) for the economic development department. The proposer shall provide professional services but are not limited to: project development & administration - design and implement a structured small contractor development program focused on developing a contractor talent pipeline for horizontal construction flatwork including concrete, curbs, gutters, paving, pavement markings, park trails, parking lots, drainage bridges, and sidewalks around buildings, as well as other public works construction including, but not limited to, electric work for streetlights and traffic signals; etc, see attached file.
Posted Date
Dec 17, 2025
Due Date
Jan 29, 2026
Release: Dec 17, 2025
Close: Jan 29, 2026
Seeks proposals from qualified firms or individuals with horizontal and vertical public works experience to finalize an exclusive agreement to provide professional services in developing and administering a small contractor development program (scdp) for the economic development department. The proposer shall provide professional services but are not limited to: project development & administration - design and implement a structured small contractor development program focused on developing a contractor talent pipeline for horizontal construction flatwork including concrete, curbs, gutters, paving, pavement markings, park trails, parking lots, drainage bridges, and sidewalks around buildings, as well as other public works construction including, but not limited to, electric work for streetlights and traffic signals; etc, see attached file.
AvailableGet AI-powered buying signals and real-time alerts for pipeline opportunities