Summary
Replace the generation capacity of existing scattergood units 1 and 2, which are conventional natural-gas-fired steam-boiler generators that would be removed from service, with a ccgs capable of operating on a fuel mixture of natural gas and a minimum of 30 percent hydrogen by volume. The proposed ccgs would consist of a combustion-turbine generator and a steam-turbine generator operating in tandem. Additional facilities or ancillary functions required to support the proposed ccgs include, but are not limited to, an air-cooled condenser, wet-surface air cooler, gas compressors, switchyard upgrades, and a dedicated pipeline for industrial wastewater discharge.