Special DistrictIL
Aug 3, 2026
Closes
Aug 24, 2026
Construction Services for the Systemwide Elevator Modernization Project (Request for Proposal)
Construction services for the systemwide elevator modernization project.
Description: Elevator Modernization and Proactive Preventative Maintenance Service Agreement.
City · ND, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Special DistrictIL
Aug 3, 2026
Closes
Aug 24, 2026
Construction services for the systemwide elevator modernization project.
Tarrant Regional Water District
Special DistrictTX
Aug 3, 2026
Closes
Aug 17, 2026
Tarrant Regional Water District is seeking proposals for fleet preventative maintenance services. The contract will run for one year, with options to renew for up to four additional one-year periods. Proposals are due by 2:00 p.m. Central Time on August 17, 2026, and the solicitation is for contracted services rather than a grant program.
Western Mun Water Dist Of Riverside
Special DistrictCA
Jul 10, 2026
Closes
Aug 6, 2026
Boiler preventative maintenance and services.
FederalDC
Aug 3, 2026
Closes
Aug 25, 2026
The Contractor shall replace existing analog audio infrastructure and its associated devices with a modern IP based solution that utilizes Dante as the primary audio transport protocol over standard ethernet. The Contractor shall provide installation, commissioning, documentation, training, and warranty for the proposed solution. Site Survey & System Design: A. Site Survey: The Contractor shall coordinate with the COR to schedule and attend a site visit with Library staff and the Library of Congress’ Facilities Services Division to review the Coolidge Theater’s existing analog audio infrastructure – to include all wall boxes, floor boxes, cable paths, conduit, equipment racks, patch bays, amplifiers, mixers, speakers. During the site visit, the Contractor shall measure approximate distances for cable runs. Electrical power draw and heat load requirements shall also be discussed with the Facilities Services Division. See attached file.
Procurement and program contacts connected to City of Grand Forks.