RFP Catalog/Paratransit Software

Paratransit Software RFPs

Browse active Paratransit Software RFP opportunities from federal, state, and local government agencies. Find solicitations, track deadlines, and discover bid opportunities updated daily.

Arizona Department of Transportation

The work consists of improving ramps, sidewalks and driveways to comply with ada requirements. The work includes curb, curb and gutter, driveway, sidewalk ramp, and sidewalk replacement, pavement marking, and other related work. Includes 1,198 LF of removal of concrete curb and gutter; 5,763 SF of removal of concrete sidewalks, driveways and slabs; 505 SY of removal of asphaltic concrete pavement; 246 ton of asphaltic concrete (miscellaneous structural) (special mix); 9,768 LF of pavement marking, preformed, white stripe, type iv; 1,200 LF of dual component pavement marking (white epoxy); see attached files.

Posted Date

May 8, 2026

Due Date

Jun 19, 2026

Timeline Progress56%
Oklahoma Department of Transportation

Provide restroom renovation project involving remodeling existing restrooms to ada compliance.

Posted Date

May 30, 2026

Due Date

Jun 9, 2026

Timeline Progress17%
City of Philadelphia

The City of Philadelphia issued the Ada Mentor Protege Pilot Program to strengthen small business capabilities by fostering mentorship partnerships between established contractors and emerging firms for ADA-related construction work. The contract work includes installation of ADA-compliant concrete curb quadrants at multiple City-designated locations, with an estimated project budget between $1,000,000 and $2,000,000. Bidders must meet City tax, licensing, and regulatory requirements and submit required tax/clearance statements as part of their proposals.

Posted Date

May 19, 2026

Due Date

Jul 2, 2026

Timeline Progress29%
City and County of San Francisco

The City and County of San Francisco Office of Contract Administration (OCA) on behalf of San Francisco International Airport (SFO) issued an Invitation for Bids to procure four (4) 2026 (or current model year) ADA trailer-mounted restroom units with attached specifications. Bids are due on June 16, 2026 at 2:00 PM PDT, with a pre-bid meeting scheduled for June 2, 2026 at 10:00 AM PDT via Microsoft Teams; delivery of the trailers is expected by June 24, 2026 to San Francisco International Airport. The solicitation requires bidders to submit required attachments (including Attachment 6 specifications and Attachment 2 Bidder Questionnaire) and comply with the City’s purchase order terms and specified minimum qualifications.

Posted Date

May 26, 2026

Due Date

Jun 16, 2026

Timeline Progress27%
Ada County

The Work to be included in the Construction Contract is generally described as a tenant improvement remodel of the existing Ada County Operations office space, including reconfiguration of existing reception, conference, and breakroom areas; demolition of existing finishes and casework; installation of new partitions, doors, storefront, casework, flooring, ceilings; and associated mechanical, electrical, plumbing, and accessibility improvements.

Posted Date

May 19, 2026

Due Date

Jun 3, 2026

Timeline Progress85%
State University of New York System Office

The State University of New York (University at Albany) seeks a cloud-based platform integrating degree audit, degree planning, student course scheduling, transfer equivalency management, and a transfer recruitment network to improve student success and administrative efficiency. The system must integrate with the university's Oracle PeopleSoft Campus Solutions SIS, comply with data privacy standards, and the anticipated contract start date is May 1, 2027 for a five-year term. Bidders must demonstrate relevant higher-education implementation experience and meet New York-specific MWBE (15% MBE, 15% WBE) and SDVOB (6%) participation goals.

Posted Date

Apr 29, 2026

Due Date

Jun 3, 2026

Timeline Progress93%
Washington State Department of Labor and Industries

Washington State Department of Labor & Industries issued RFQQ K6063 to procure a web-based scheduling system and interpretation services (IPI, OPI, VRI) for health care and vocational providers serving limited-English-proficient injured workers and crime victims. The vendor must provide a 24/7 scheduling platform, maintain a network of certified Language Access Providers, and handle HIPAA-compliant billing and reporting. The solicitation contemplates a contract term through February 12, 2030, with awards potentially made by service category.

Posted Date

Apr 20, 2026

Due Date

Jun 2, 2026

Timeline Progress97%
Southwest Metro Transit Commission

Procurement of the furnishing and installation of a bus wash. To remove and dispose of existing bus wash, bus wash electrical, piping and all elements of existing bus wash, and RO water system that will not be used with the new bus wash. To furnish and install a completely automatic, touchless and friction combination of heavy-duty vehicle wash and splash wall.

Posted Date

Feb 25, 2026

Due Date

Jun 5, 2026

Timeline Progress96%
Utah Transit Authority

The Utah Transit Authority (UTA) is soliciting a contractor to fabricate and install 16 handrails and 40 guardrails, and remove and dispose of existing rails at seven TRAX stations. Questions are due 2026-05-26 and an Intent to Bid is due 2026-06-10; the estimated value range is $180,000–$420,000 (AI estimate). The solicitation was posted 2026-05-13 and is open through 2026-06-10.

Posted Date

May 13, 2026

Due Date

Jun 10, 2026

Timeline Progress67%
Tri-County Council for Lower Eastern Shore of Maryland

Place security fencing around the perimeter of the bus parking lot and Maintenance Facility (roughly 1500 feet).

Posted Date

May 17, 2026

Due Date

Jun 5, 2026

Timeline Progress77%
City of St. George

The purpose of this study is to evaluate and enhance the existing suntran system to support planned growth, improve mobility, and align public transportation with the metropolitan area long-term infrastructure and economic objectives.

Posted Date

May 8, 2026

Due Date

Jun 5, 2026

Timeline Progress85%
Steuben County

Provide one (1) bus shelter. Handi hut item code 6-2wsb with sth-1501-36, or equal.

Posted Date

May 28, 2026

Due Date

Jun 18, 2026

Timeline Progress18%
City of Inglewood

Integration, deployment, testing, and support of the Intelligent Transit System (IITS). The system will improve transit travel time, on-time performance, reliability, and passenger experience while maintaining safe and efficient traffic operations. The IITS system shall provide: Improved shuttle/bus travel time, Reduce dwell-related delays and improve rider reliability, Minimize negative impacts to general traffic and pedestrians, Ensure interoperability with existing traffic signal controllers, transit systems, and IITS infrastructure, Provide measurable performance reporting, dashboards, and analytics, Implement robust cybersecurity, data governance, and maintainability.

Posted Date

Apr 23, 2026

Due Date

Jun 22, 2026

Timeline Progress65%
Town of Telluride

The Town of Telluride Public Works is soliciting proposals for a Transit Addition project to expand or improve transit facilities. The posting lists solicitation dates and directs vendors to the buyer’s official posting for full documentation. Bidding is open and scheduled to close on May 29, 2026.

Posted Date

Apr 21, 2026

Due Date

May 29, 2026

City of Danville

Mass transit roof restoration.

Posted Date

Apr 17, 2026

Due Date

Jun 2, 2026

Timeline Progress97%
Massachusetts Department of Transportation

Transit station platform screen doors.

Posted Date

May 13, 2026

Due Date

Jun 18, 2026

Timeline Progress52%
Town of Chester

Ada walkway improvements project.

Posted Date

May 12, 2026

Due Date

Jun 4, 2026

Timeline Progress86%
Suny College Of Environmental Science And Forestry

The project consists of removal of the existing interior signage, patching, repair & painting and then installation a new directory for Gateway Center and new interior signage.

Posted Date

May 11, 2026

Due Date

Jun 10, 2026

Timeline Progress69%
Indiana Department of Natural Resources

Rental and maintenance of ADA portable toilets. See attached files.

Posted Date

May 7, 2026

Due Date

Jun 8, 2026

Timeline Progress77%
Gardnerville, Town of

Work includes approx. 1,075 SF of sawcut, remove and dispose of existing asphalt concrete; 3,800 SF of furnish and install asphalt pavement 4" AC over 6" AB; 910 SF of furnish and install extended boat ramp PCC section; 78 LF of finish and install new 4" PCC on 6" AB sidewalk ramp, include curbs for handrail and mid ramp landing; 166 LF of furnish and install handrails.

Posted Date

May 13, 2026

Due Date

Jun 18, 2026

Timeline Progress52%

Win More Paratransit Software RFPs

Get AI-powered buying signals and real-time alerts for paratransit software opportunities

✓ Trusted by 150+ public sector sellers✓ First results in first weeks✓ Free demo available