Raleigh Fire Station No. 15 RFP
Posted
Nov 19, 2026
Jan 14, 2027
New 2-story, 3-bay Fire Station No. 15 building, new parking lot for the Anne Gordon Active Senior Center, and demolition of the existing Fire Station No. 15 building.
Track open bid opportunities, contracts, public meetings, and key contacts for City of Raleigh.
Active opportunities open for bidding
Posted
Nov 19, 2026
Jan 14, 2027
New 2-story, 3-bay Fire Station No. 15 building, new parking lot for the Anne Gordon Active Senior Center, and demolition of the existing Fire Station No. 15 building.
Posted
Nov 18, 2026
Jan 14, 2027
Construction of sanitary sewer improvements, including replacement and rehabilitation of gravity sewer, trenchless sewer installation, stream stabilization, and greenway improvements.
Posted
Nov 12, 2026
Jan 7, 2027
Work includes increase the pump station capacity by installing three new submersible pumps within the existing wet well, other miscellaneous improvements, addition of fall protection to hatches above the wet well, site grading to eliminate ponding, yard piping and installation of a new electromagnetic flowmeter, installation of a new generator and concrete generator pad, scada improvements.
Posted
Nov 13, 2026
Jan 7, 2027
Poole Road Pump Station Improvements: 1) Increase the pump station capacity by installing three new submersible pumps within the existing wet well. 2) Other miscellaneous improvements: i) Addition of fall protection to hatches above the wet well. ii) Site grading to eliminate ponding. iii) Yard piping and installation of a new electromagnetic flowmeter. iv) Installation of a new generator and concrete generator pad. v) SCADA improvements.
Posted
Nov 13, 2026
Dec 9, 2026
Remove existing, damaged roofing material down to substrate for both the roof and wall surfaces damaged by the fire on December 1st, 2026 and replace with in-kind materials as described in the bid documents. The work also includes the replacement of five damaged area drains in the upper roof gutter area. The roof, walls, and gutter area being repaired is roughly 20,000 square feet. The Contractor shall restore the structural integrity of the affected areas to meet all applicable codes, standards, and design requirements. The facility will remain operational during construction. The Contractor shall coordinate all work activities to maintain safe access and minimize impact to daily operations and scheduled events. The selected Contractor shall be responsible for coordinating, securing, and obtaining all necessary permits and approvals for any road closures, lane closures, or traffic control measures required in connection with the Project. All work shall be performed in accordance with the project drawings, specifications, and applicable City of Raleigh standards.
Posted
Nov 12, 2026
Dec 17, 2026
Existing condition assessment, demolition and replacement of outdoor site luminaires at the Wilders Grove Solid Waste Services campus located in Raleigh, North Carolina.
Posted
Nov 10, 2026
Nov 30, 2026
Raleigh Water is seeking proposals from qualified consulting firms to conduct a comprehensive departmental staffing analysis and part-time employee compensation study. The staffing analysis will evaluate current staffing levels, organizational structure, workload demands, service levels and operational efficiencies across all Raleigh Water divisions. The study will include peer benchmarking, an assessment of current staffing practices and the development of a staffing model to evaluate existing needs and project future staffing requirements over a 10-year period. The part-time compensation study will assess existing part-time positions, job responsibilities and compensation practices to develop a standardized, equitable and competitive pay structure. This effort will include market benchmarking, position groupings and recommended pay ranges based on job duties, qualifications and responsibilities.
Posted
Nov 10, 2026
Dec 15, 2026
Sanford Creek Sewer Interceptor: Installation of approximately 3,600 linear feet of 16-inch and 3,400 linear feet of 12-inch PVC gravity sewer lines including two trenchless crossings, abandonment of the existing Willow Crest sewer pump station and manholes and appurtenant items.
Posted
Nov 10, 2026
Dec 15, 2026
Sanford Creek Sewer Interceptor: Installation of approximately 3,600 linear feet of 16-inch and 3,400 linear feet of 12-inch PVC gravity sewer lines including two trenchless crossings, abandonment of the existing Willow Crest sewer pump station and manholes and appurtenant items.
Posted
Nov 10, 2026
Nov 30, 2026
Raleigh Water is seeking proposals from qualified consulting firms to conduct a comprehensive departmental staffing analysis and part-time employee compensation study. The staffing analysis will evaluate current staffing levels, organizational structure, workload demands, service levels and operational efficiencies across all Raleigh Water divisions. The study will include peer benchmarking, an assessment of current staffing practices and the development of a staffing model to evaluate existing needs and project future staffing requirements over a 10-year period. The part-time compensation study will assess existing part-time positions, job responsibilities and compensation practices to develop a standardized, equitable and competitive pay structure. This effort will include market benchmarking, position groupings and recommended pay ranges based on job duties, qualifications and responsibilities.
Key metrics and characteristics
Census ID
Government ID for mapping buyers across datasets.
171305
Employee FTE
Full-time equivalent employees.
4,570.8
Population
Population size to gauge opportunity scale.
506,306
Procurement Difficulty Score
How easy their procurement process is to navigate. Lower is better.
54 / 100
Propensity to Spend
How likely this buyer is to spend on new technology based on operating budget trends.
AI Adoption Score
How likely this buyer is to adopt new AI technologies.
Startup Friendliness
How often this buyer champions startups and early adoption.
Latest Budget Year
Unlock to view
Operating Budget
Unlock to view
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
AI-ranked best-fit opportunities before bid boards
Auto-drafted, compliance-ready outlines & boilerplate
Competitor & pricing intel from past awards
Procurement guidance and navigation tips.
These purchasing programs appear in City of Raleigh's records. Starbridge can help check which contracts cover your product.

Procurement Difficulty Score
Lower scores indicate easier procurement. Created by Starbridge.
Quick Decision Flow
Sole Source
Cooperatives
Full playbooks include agency-specific workflows, thresholds, and vendor benchmarks.
Board meetings and strategic plans from City of Raleigh
The meeting included reports from the Raleigh Youth Council regarding their recent activities, such as induction ceremonies, community events, and future planning initiatives like teen think tanks and holiday programs. Additionally, there was a detailed update on teen programs and services, which focused on gathering feedback from local youth regarding curfew discussions, their needs for safe recreational spaces, and their desire for mentorship and after-school engagement opportunities.
The Council conducted a regular meeting covering various administrative and legislative matters. Key discussion topics included the acknowledgment of several annexation petitions, acceptance of equipment donations for the police department, and authorization of multiple contracts for infrastructure, GIS software, fuel delivery, and public safety technology. The Council addressed budget transfers for mobility projects and awarded construction bids for water mains, park development, and road widening. Additionally, the Council held public hearings regarding annexations and zoning amendments, approved text changes for daycare regulations, received economic development updates, and appointed members to various commissions, including the Arts Commission, Design Review Commission, Human Relations Commission, and Police Advisory Board.
Public-sector contacts connected to City of Raleigh.
Native sync to Salesforce & HubSpot
The meeting consisted of an evening public comment session where community members addressed several concerns. Key discussion topics included a petition regarding excessive vehicle exhaust noise, public safety technology, national politics, the cost of living, and the need for affordable grocery stores. Additionally, speakers raised concerns regarding data centers, cultural districts, city precinct matters, public transportation experiences, housing events, and stormwater management and streambank erosion. The council also referenced the established procedure for submitting public comments via voicemail.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Raleigh meetings, strategic plans, and budget discussions before the public bid appears.
Early signals from meeting minutes and plans
Vendor mentions and competitor tracking
Decision timeline from discussion to RFP
Quotable insights from buyer leadership