RFP Catalog/Highway

Highway RFPs

Find highway RFP opportunities from state departments of transportation, highway departments, and road authorities. Browse solicitations for road construction, bridge projects, highway maintenance, and traffic management updated daily.

City of Federal Way

The City of Federal Way is soliciting architect-engineering (A&E) professional services for the Pacific Highway Non-Motorized Trail Phase 3 and construction inspection. The solicitation is open with a posted start date of 2026-05-08 and closes on 2026-06-05 at 17:00 local time; vendors should consult the City posting for submission instructions and attached RFQ documents. Contact for the solicitation is Jonathan Strong (jonathan.strong@federalwaywa.gov, 253-835-2753).

Posted Date

May 8, 2026

Due Date

Jun 6, 2026

Timeline Progress82%
Alaska Department of Transportation and Public Facilities

Project will reconstruct Highway MP 14 Railroad Crossing to accommodate Railroad Corporation's project to raise the railroad grade. Work includes grading, drainage improvements, MSE wall, bridge, paving, signing, and striping. The Project completion date will be September 30, 2027.

Posted Date

-

Due Date

Jun 3, 2026

Pasco County

Work includes approx. 1,490 SF of roadway widening, 835 SF of new sidewalk, 7,225 SF of mill and overlay.

Posted Date

May 5, 2026

Due Date

Jun 9, 2026

Timeline Progress76%
Charleston County

Charleston County is soliciting qualifications from engineering firms to provide Construction Engineering & Inspection (CE&I) services for the Maybank Highway Improvements project, which adds a second lane on Maybank Highway (SC 700) from Johns Island to James Island. The contract includes preconstruction support, CE&I oversight with SCDOT-certified inspectors, inspection/testing, verification surveys, and public relations, and has a period of performance of 600 calendar days from Notice to Proceed. The solicitation requires compliance with Small Business Enterprise (SBE) subcontracting requirements and is expected to advertise the construction phase in Q3 2026.

Posted Date

May 28, 2026

Due Date

Jun 30, 2026

Timeline Progress11%
Washington County

Washington County Government (MD) issued a public solicitation for the design-build of the Western Section Highway Department Fuel Center (Contract No. MI-WH-316-28) with an estimated value range of $2,500,000 to $8,500,000. Bidders must register on the Washington County bidding portal to access the Invitation to Bid, solicitation documents, and to submit proposals; a pre-bid conference is scheduled for June 10, 2026 (in-person with a virtual Teams option). Proposals are due July 15, 2026 and this is a competitive procurement (not a grant).

Posted Date

May 20, 2026

Due Date

Jul 15, 2026

Timeline Progress21%
Maryland Department of Transportation

The work will consist of the following: base widening, curb and gutter construction, traffic barrier upgrades, full depth pavement to add slip ramp connections, stormwater management facilities and drainage structures, milling and resurfacing, maintenance of traffic, erosion and sediment control, signing and pavement marking, lighting, and landscaping.

Posted Date

Apr 28, 2026

Due Date

Jun 4, 2026

Timeline Progress91%
Oregon Department of Transportation

Grading, drainage, paving, curb ramps, signing, signals & roadside development includes 10,300 LF asphalt pavement sawcutting 6 to 14" deep, 70 LF mainline video inspection, 16 LF 3" drain pipe, 70 LF 12" storm sewer pipe 5 FT depth, 10 LF 12" ductile iron pipe 5 FT, 1 EA concrete manholes shallow, 200 SY cold plane pavement removal 2" deep, 4,200 ton aggregate base. See outside link.

Posted Date

May 15, 2026

Due Date

Jun 11, 2026

Timeline Progress62%
W7M8 USPFO Activity IA ARNG

Provide technical instruction services for highway drug investigations for patrol course.

Posted Date

Mar 20, 2026

Due Date

Jun 3, 2026

Timeline Progress97%
Delaware River Joint Toll Bridge Commission Of Pa And Nj

Construction Management/Construction Inspection Services for the Trenton-Morrisville Toll Bridge ESS Cameras and Highway Lighting Improvements.

Posted Date

May 21, 2026

Due Date

Jun 18, 2026

Timeline Progress38%
Illinois Department of Transportation

Work includes approx 30 CY earth excavation; 1,041 SY hot-mix asphalt surface removal - butt joint; 2,467 SF portland cement concrete sidewalk 4"; 164 LF combination concrete curb and gutter, type b-6.24; 14,631 LF temporary pavement marking - line 4"- paint. See outside link.

Posted Date

May 8, 2026

Due Date

Jun 12, 2026

Timeline Progress68%
Overton County

Asphalt materials (RS-2/AE-3 paving blend. Enviro-patch (cold mix).

Posted Date

May 18, 2026

Due Date

Jun 16, 2026

Timeline Progress47%
City of Irving

The City of Irving Capital Improvements Department seeks qualified civil and multidisciplinary engineering firms to provide design services for installation of a 24-inch water supply pipeline along State Highway 183 from west of Carl Rd. to Tom Braniff Drive. The solicitation is a Request for Qualifications (ID 102D-26F) with a pre-submittal meeting and a public opening of submissions via Microsoft Teams; electronic submission is encouraged. The buyer portal lists detailed specifications and attachments but documents require portal access to view.

Posted Date

May 19, 2026

Due Date

Jun 12, 2026

Timeline Progress53%
City of Phoenix

Project consists of safety improvements, traffic signal system by installing new signals, incorporating flashing yellow arrows for left-turn movements, and upgrading pedestrian signal equipment. Additional improvements include upgrading of ADA-compliant curb ramps, and targeted crosswalk illumination to improve pedestrian visibility. These enhancements are intended to increase overall intersection safety by improving signal visibility, reducing conflict points, and providing safer, more accessible pedestrian crossings.

Posted Date

May 14, 2026

Due Date

Jun 9, 2026

Timeline Progress68%
Arizona Department of Transportation

The work consists on drainage improvement by extending existing Concrete Box Culverts (CBC) up to the Clear Zone at five locations within the project limits. The work also includes replacing existing pavement, removing existing guardrail and replacing existing fence, placing riprap, pavement marking and other related work.

Posted Date

Mar 30, 2026

Due Date

Jun 5, 2026

Timeline Progress94%
Clark County

This project will retrofit catch basins / curb inlets along both sides of NE Highway 99 between NE 78th Street and NW 86th Street by installing storm filter cartridges to provide water quality treatment. This project will also retrofit cat basins / curb inlets along both sides of NE Highway 99 from around Hazel Del Plaza to around NW 102nd Street (minus 99th Street) by installing storm filter cartridges to provide water quality treatment. Primary bid items: traffic control, ITS relocation and replacement, sewer pipe, stormwater vault, stormwater filter catch basins, HMA CL 3/8", concrete curb and gutter, concrete sidewalk.

Posted Date

May 12, 2026

Due Date

Jun 2, 2026

Timeline Progress94%
Jefferson Center Metropolitan District 1

work inlcudes demolition, roadway and flatwork, traffic signals, foundations, electrical & wiring, signage & striping, traffic control.

Posted Date

May 21, 2026

Due Date

Jun 9, 2026

Timeline Progress56%
Michigan Department of Technology, Management and Budget

1.50 mi of hot mix asphalt base crushing and shaping, hot mix asphalt paving, and pavement markings on nash highway.

Posted Date

May 8, 2026

Due Date

Jun 5, 2026

Timeline Progress85%
Maryland State Highway Administration

The Maryland Department of Transportation State Highway Administration is soliciting construction services for improvements to U.S. 219 in Garrett County, covering approximately 2.30 miles of roadway. The project scope includes asphalt patching, resurfacing, milling, and the installation of a center turn lane, bicycle lanes, and pedestrian refuge islands. Electronic bids are required to be submitted via the Bid Express portal by the deadline of June 11, 2026.

Posted Date

May 5, 2026

Due Date

Jun 11, 2026

Timeline Progress72%
Town of Hazel Green

Work includes sealcoating.

Posted Date

May 28, 2026

Due Date

Jun 12, 2026

Timeline Progress25%
California Department of Transportation

Highway maintenance program.

Posted Date

Jan 12, 2026

Due Date

Jun 2, 2026

Timeline Progress99%

Public preview limited to 5 pages

Starbridge customers get unlimited access to thousands of opportunities, contact data, and competitive intelligence.

Book a Demo →

Win More Highway RFPs

Get AI-powered buying signals and real-time alerts for highway opportunities

✓ Trusted by 150+ public sector sellers✓ First results in first weeks✓ Free demo available