Highway RFPs
Find highway RFP opportunities from state departments of transportation, highway departments, and road authorities. Browse solicitations for road construction, bridge projects, highway maintenance, and traffic management updated daily.
Highway Improvement
AvailableMill and overlay.
Posted Date
Release: May 20, 2026
Due Date
Close: Jun 11, 2026
Highway - Semi-annual - Fuel
AvailableSupply source for Ultra-low Sulphur Diesel to be utilized by the County Highway Department. This fuel source is to be utilized at a vendor location by the County Highway Department where the Maury County Highway Department would fill a County owned fuel service truck on an “as needed” basis.
Posted Date
Release: May 20, 2026
Due Date
Close: Jun 3, 2026
Highway materials, supplies and services.
Posted Date
Release: May 20, 2026
Due Date
Close: Jun 9, 2026
Highway Garage Roof Rehabilitation
AvailableRehabilitation of the metal roof system of highway garage.
Posted Date
Release: May 22, 2026
Due Date
Close: Jun 12, 2026
Hot Mix Asphalt (HMA) Concrete Pavement, Snow Plow Cutting Edges, Rock Salt and Transportation, UV CIPP Culvert Lining.
Posted Date
Release: Mar 5, 2026
Due Date
Close: May 29, 2026
Seeking experienced and properly equipped contractor to install a finished concrete garage floor with slotted floor drains in an existing highway facility (pole barn). The project also includes the installation of finished exterior reinforced concrete pads at door locations.
Posted Date
Release: Apr 30, 2026
Due Date
Close: Jun 5, 2026
Work includes maintenance of landscaped areas. Work consists of maintenance of planted areas through continued watering, weeding, fertilizing, mowing, reseeding, cultivating, spraying, mulching, trimming and care of shrubs and trees, edging, invasive plant removal and other services necessary for care and upkeep of plantings. This section also describes replacement of dead or damaged plants, cleaning and clearing of sidewalks, gutters, swales, and ditches within the contract limits; removal and disposal of trash and debris.
Posted Date
Release: Apr 29, 2026
Due Date
Close: Jun 5, 2026
Drilling service.
Posted Date
Release: May 18, 2026
Due Date
Close: Jun 16, 2026
supply of explosives.
Posted Date
Release: May 18, 2026
Due Date
Close: Jun 16, 2026
Highway Aggregate Materials FY27 RFP
AvailableSealed bids are for the yearly purchase of highway aggregate materials for various highway projects and emergency repair work for the Town of New Marlborough from July 1, 2026, through June 30, 2027.
Posted Date
Release: May 27, 2026
Due Date
Close: Jun 10, 2026
Surplus Sale - Quonset.
Posted Date
Release: May 22, 2026
Due Date
Close: May 29, 2026
Provide highway traffic paint.
Posted Date
Release: May 22, 2026
Due Date
Close: Jun 2, 2026
Bridge & highway maintenance & hauling.
Posted Date
Release: Nov 13, 2025
Due Date
Close: Jun 8, 2026
Kenosha County is seeking bids for the replacement of overhead garage doors and openers at the Highway Division facility in Bristol, Wisconsin. The project involves removing existing equipment and installing new Raynor TM300 steel doors and Liftmaster GH103L5 openers along with associated hardware and low-voltage electrical components. Bidders must provide all necessary labor and materials, while high-voltage electrical work will be managed by county staff.
Posted Date
Release: May 22, 2026
Due Date
Close: Jun 22, 2026
Crushed Stone to be utilized at various locations. This specification covers the quality of rock to be used in the construction of rock riprap.
Posted Date
Release: May 8, 2026
Due Date
Close: Jun 3, 2026
America State Highway Map (RFQ)
Available400,000 EA 2026 250 America state highway map. Seeking a one-time purchase for State Highway Maps.
Posted Date
Release: May 28, 2026
Due Date
Close: Jun 1, 2026
Tree removal & trimming. Scope of work includes - tree removal: minimum 72' aerial lift (2 section w/ elevator), with operator and including full complement of power saws, hydraulic stick saw, blower, hand tools and other equipment necessary for ordinary tree care and removal operations. Two-man crew required, one to operate aerial lift and one ground man; see attached file.
Posted Date
Release: May 6, 2026
Due Date
Close: Jun 4, 2026
Provide crack sealing, tree removal & trimming, dry screened sand, processed gravel, and line painting.
Posted Date
Release: May 6, 2026
Due Date
Close: Jun 4, 2026
Highway - Annual - FY-27 - Culverts
AvailableGalvanized culverts and plastic double wall reinforced pipe and bands to be utilized at various locations.
Posted Date
Release: May 20, 2026
Due Date
Close: Jun 3, 2026
Highway Materials.
Posted Date
Release: Apr 15, 2026
Due Date
Close: Jun 11, 2026
Win More Highway RFPs
Get AI-powered buying signals and real-time alerts for highway opportunities