0000 CH BIS - System Enhancement
Posted
Aug 17, 2026
Oct 16, 2026
Work consists of constructing a shared use path in place of the existing sidewalk. The work includes construction of concrete retaining walls and sidewalk, grading, concrete curb and gutter, pavement marking, signing, lighting and other related work.
