RFP Catalog/Highway

Highway RFPs

Find highway RFP opportunities from state departments of transportation, highway departments, and road authorities. Browse solicitations for road construction, bridge projects, highway maintenance, and traffic management updated daily.

Maury County

Asphalt, related components and painted pavement markings to be utilized at various locations.

Posted Date

May 20, 2026

Due Date

Jun 3, 2026

Timeline Progress84%
Texas Department of Transportation

TxDOT is soliciting bids to establish a contract for pest control services at multiple Odessa District facilities, including offices, maintenance facilities, and warehouses. The contract period is expected to run for one year with possible renewals and includes regular inspections, treatments, and monitoring. The solicitation process includes a mandatory pre-response conference and requires all bids to be submitted through the buyer's procurement portal.

Posted Date

May 21, 2026

Due Date

Jun 11, 2026

Timeline Progress51%
Iowa Department of Administrative Services

The Iowa Department of Administrative Services is soliciting quotes for janitorial and custodial cleaning services for the Ames Maintenance Garage (Highway 30, 2nd Floor). The one-year contract includes weekly/monthly cleaning, semi-annual strip/waxing of floors, shampooing of carpets, and window washing, with up to five one-year renewal options. The solicitation follows Iowa Administrative Code 761--20 and requires bidders to provide references, insurance, and backup staffing plans.

Posted Date

May 22, 2026

Due Date

Jun 1, 2026

Timeline Progress97%
Arkansas Department of Transportation

Procurement for milling and overlaying approximately 3.899 miles of Highway 1 in Poinsett County, including asphalt surface course, cold milling, patching, traffic maintenance, rumble strips, and pavement marking.

Posted Date

-

Due Date

Nov 25, 2026

Oregon Department of Transportation

Drainage includes 3 CY loose riprap class 50, 660 LF mainline video with laser profile inspection, 220 LF 18" storm sewer pipe 5 FT depth, 440 LF 18" storm sewer pipe 10 FT depth, 3 EA concrete inlets type D, 75 ton aggregate shoulders, 0.20 acre permanent seeding.

Posted Date

May 1, 2026

Due Date

Jun 4, 2026

Timeline Progress90%
City of Bakersfield

The City of Bakersfield is soliciting qualified professionals or teams to develop a specific plan for the Taft Highway Corridor, including community outreach, existing conditions analysis, design guidelines, and strategies for land use, transportation, and public services. The work will address zoning, environmental impacts, and infrastructure improvements needed to guide sustainable development in the corridor. Proposers must demonstrate experience in urban planning, community engagement, required licenses, certifications, and comply with local regulations and insurance requirements.

Posted Date

May 14, 2026

Due Date

Jun 12, 2026

Timeline Progress61%
Baltimore County

Baltimore County Government issued an RFB for a gas detection system for the Sparrows Point Highway Shop, seeking vendors to provide and install specified gas detection equipment. The solicitation has an estimated value range of $100,000 to $500,000 and was posted on April 29, 2026. Interested respondents must download the complete bid package from the official Baltimore County purchasing and opportunities website.

Posted Date

Apr 29, 2026

Due Date

Jun 8, 2026

Timeline Progress82%
City of Irwindale

Redevelopment of 22,410-SF iha-owned vacant site into a high-quality affordable multi-family residential housing project.

Posted Date

Apr 14, 2026

Due Date

Jun 3, 2026

Timeline Progress95%
Texas Department of Transportation

The Texas Department of Transportation (TxDOT) issued a Local Let Maintenance Contract to mow and maintain the highway right-of-way along US0290 in Waller County with an estimated cost of $306,205.78. Bidding is limited to prequalified contractors; proposals are due June 9, 2026 at 10:30 AM (local time). The period of performance is 365 calendar days from the start date and the solicitation was posted on May 18, 2026.

Posted Date

May 18, 2026

Due Date

Jun 9, 2026

Timeline Progress62%
Barrow County

Intersection improvements includes installing all material and labor necessary for a new traffic signal, signage, and pavement markings for the intersection.

Posted Date

May 19, 2026

Due Date

Jun 18, 2026

Timeline Progress42%
Iowa Department of Transportation

Cleaning services for maintenance garage.

Posted Date

May 11, 2026

Due Date

Jun 1, 2026

Timeline Progress99%
Texas Department of Transportation

The Texas Department of Transportation is soliciting a Local Let Maintenance Contract for mowing and maintenance of highway right-of-way along US0277 in Maverick County. This is a waived project limited to prequalified contractors, with an estimated value of $439,480 and a period of performance of 730 calendar days. The response deadline for this maintenance opportunity is June 18, 2026.

Posted Date

May 22, 2026

Due Date

Jun 18, 2026

Timeline Progress36%
Town of Dudley

Bid package 7, corrugated pipe, polyethylene delivered to highway garage.

Posted Date

Jan 27, 2025

Due Date

Jun 2, 2026

Timeline Progress100%
Town of Dudley

Corrugated pipe, steel, and aluminum, delivered to highway garage.

Posted Date

May 5, 2026

Due Date

Jun 2, 2026

Timeline Progress95%
Grant Township

Work for which proposals are invited will consist of, in general, but shall not be limited to, the following: 1,400 ft (0.27 miles) of pavement removal, subgrade improvements, HMA binder and surface course placement, removal and replacement of concrete curb and gutter, removal and replacement of PCC sidewalk, sidewalk intersection improvements for ADA compliance, driveway pavement removal and replacement, landscape restoration, and other associated improvements in accordance with the Contract Plans and Specifications.

Posted Date

May 21, 2026

Due Date

Jun 4, 2026

Timeline Progress77%
Town of Moultonborough

Seeking proposals from qualified companies for the construction of a concrete foundation to support a clearspan monoslope structure. Work includes full-service installation, including all framing of formwork, installation of rebar and anchor bolts, and pouring of concrete.

Posted Date

May 6, 2026

Due Date

Jun 4, 2026

Timeline Progress89%
Overton County

Right of way chemical spraying and right of way mowing.

Posted Date

May 18, 2026

Due Date

Jun 16, 2026

Timeline Progress47%
Gwinnett County

This is a pedestrian improvement project/contract consisting of 0.840 miles of clearing & grubbing, grading, curb & gutter, sidewalk, concrete, wall, asphalt paving, drainage, signing & striping. Work includes approx. 1,500 CY earthwork, 1,654 LF curb & gutter, 3,464 SY concrete flat work, 342 LF storm drain pipe, 40 CY concrete structure, 50 TN asphalt.

Posted Date

May 27, 2026

Due Date

Jun 25, 2026

Timeline Progress16%
Illinois Department of Transportation

17 pallets (250 per box, 48 boxes per pallet, 12,000 total maps per pallet) – 204,000 maps total for delivery; Press approval on site of IDOT Mapping staff is required. The contract will have an initial term commencing upon the last dated signature of the Parties and ending on August 10, 2026.

Posted Date

May 27, 2026

Due Date

Jun 16, 2026

Timeline Progress24%
County of Fresno

Application for funding for projects related to off-highway or fish and game propagation.

Posted Date

-

Due Date

Jun 30, 2026

Win More Highway RFPs

Get AI-powered buying signals and real-time alerts for highway opportunities

✓ Trusted by 150+ public sector sellers✓ First results in first weeks✓ Free demo available