Proposed Improvement Bridge Project - Mt. Holly ER P23-1(334)
Posted
Oct 3, 2026
Oct 30, 2026
Replacement of bridge along with roadaway and channel work.
Track open bid opportunities, contracts, public meetings, and key contacts for Vermont Agency of Transportation.
Active opportunities open for bidding
Posted
Oct 3, 2026
Oct 30, 2026
Replacement of bridge along with roadaway and channel work.
Posted
Sep 30, 2026
Oct 14, 2026
The Agency of Transportation - Contract Administration is seeking bids for culvert replacement on Vermont Route 100 at mile marker 1.036 in Weston. The work includes removal of the existing concrete box culvert, channel relocation, and installation of a precast concrete box culvert with associated roadway and channel work. The state lists it as a job contract, with bids closing October 14, 2026 at 11:00 a.m.
Posted
Sep 15, 2026
Nov 17, 2026
Seeking competitive proposals for the design, construction, ownership, operation, and maintenance of electric vehicle (EV) charging infrastructure, also referred to as electric vehicle supply equipment (EVSE), at locations along Vermont’s designated Alternative Fuel Corridors (AFCs) and at eligible community locations outside of highway corridors. This Request for Proposals (RFP) is intended to build upon previously installed and contracted-to-bebuilt Direct Current Fast Charging (DCFC) EVSE and further establish a reliable, convenient, and accessible network of fast EV charging stations throughout Vermont.
Key metrics and characteristics
City
The city where this buyer is located.
Barre
County
The county where this buyer is located.
Washington
Phone Number
Contact phone number for this buyer.
(802) 917-2458
Zip Code
Postal code for this buyer's location.
05641
Propensity to Spend
How likely this buyer is to spend on new technology based on operating budget trends.
AI Adoption Score
How likely this buyer is to adopt new AI technologies.
Startup Friendliness
How often this buyer champions startups and early adoption.
Latest Budget Year
Unlock to view
Operating Budget
Unlock to view
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
AI-ranked best-fit opportunities before bid boards
Auto-drafted, compliance-ready outlines & boilerplate
Competitor & pricing intel from past awards
Board meetings and strategic plans from Vermont Agency of Transportation
The council reviewed the FY 2025 budget, specifically highlighting the status of BUILD-based and FEMA projects. Discussions regarding passenger rail focused on the Corridor ID program, recent ridership performance, and the feasibility study for the Montreal Station. The council evaluated the potential expansion of Green Mountain Railroad passenger services and reviewed updates on freight operations and infrastructure construction, including extensive bridge repair projects. The meeting also included reports on Operation Lifesaver activities and public comments concerning commuter rail development and transportation density.
The council discussed updates regarding Amtrak's expansion to Burlington, including rail yard progress and ridership performance for passenger services. Freight and construction reports covered various ongoing infrastructure projects, such as bridge and crossing repairs, as well as the status of FY23 budget allocations for station and track improvements. Additionally, members reviewed Operation Lifesaver's public safety outreach strategies for the upcoming rail service and discussed congressional funding earmarked for regional rail and trail facilities. Public input included recognition of industry awards and discussions on rail car leasing opportunities and regional infrastructure improvements.
Public-sector contacts connected to Vermont Agency of Transportation.
Native sync to Salesforce & HubSpot
The council received updates on several key rail initiatives, including the progress of the Corridor ID projects and the status of gap analyses for the Vermonter and Green Mountain Corridors. Amtrak ridership data was reviewed, highlighting performance trends, capacity considerations, and the impact of recent infrastructure and flooding events. Discussions also covered the feasibility study for a preclearance facility in Montreal, the successful acquisition of a CRISI grant for the Burlington Branch upgrade, and detailed reports on ongoing bridge and culvert construction projects, including storm damage repairs. Finally, the meeting included updates on Operation Lifesaver's community engagement efforts and the status of the Statewide Rail Plan, with plans to gather public input and continue coordinating on future priorities.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Vermont Agency of Transportation meetings, strategic plans, and budget discussions before the public bid appears.
Early signals from meeting minutes and plans
Vendor mentions and competitor tracking
Decision timeline from discussion to RFP
Quotable insights from buyer leadership