Katherine Plant Sewer Realignment
Posted
Sep 8, 2026
Sep 21, 2026
Constructing a gravity sanitary sewer reroute at the Katherine Plant-approx. 138 LF of 8" SDR-35 PVC gravity sewer main between two existing manholes, including manhole tie-ins(rebuild bench and invert; core/boot connection), abandonment of the existing line with non-shrink grout, sewer by-pass/flow control during tie-ins, erosion and sediment control, and all required testing.