Closing soon

Katherine Plant Sewer Realignment

Description: Constructing a gravity sanitary sewer reroute at the Katherine Plant-approx. 138 LF of 8" SDR-35 PVC gravity sewer main between two existing manholes, including manhole tie-ins(rebuild bench and invert; core/boot connection), abandonment of the existing line with non-shrink grout, sewer by-pass/flow control during tie-ins, erosion and sediment control, and all required testing.

Buyer
Chester Sewer District

SpecialDistrict · SC, US

Released
Sep 8, 2026
Closes
Sep 21, 2026(11 days left)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts