RFP Catalog/Highway

Highway RFPs

Find highway RFP opportunities from state departments of transportation, highway departments, and road authorities. Browse solicitations for road construction, bridge projects, highway maintenance, and traffic management updated daily.

City of Norton Shores

Traffic signal upgrade at the airline highway at airport road intersection. Wood pole, span wire, traffic signal, traffic loop, controller, and cabinet upgrade.

Posted Date

May 21, 2026

Due Date

Jun 18, 2026

Timeline Progress38%
Overton County

Grader blades.

Posted Date

May 18, 2026

Due Date

Jun 16, 2026

Timeline Progress47%
Chester Water Authority

Work inlcudes 2,900' furnish all necessary material, labor & equipment to complete install new 6" and 8" diameter class 52 DICL water main; furnish all necessary material, labor & equipment to complete install new new 8" diameter, DR-18 class 235 fusible pvc water main by directional drill; furnish all necessary material, labor & equipment to complete install 6" and 8" diameter full body tapping sleeve and tapping valve from water main or large diameter service lateral. See attached file.

Posted Date

May 11, 2026

Due Date

Jun 9, 2026

Timeline Progress71%
City of Tama

Work includes approx. 1,426 CY of excavation Class 13;2 EA of manhole, storm sewer;9 EA of manhole adjustment; 438 LF of 15" RCP storm sewer; 5 EA of storm sewer abandonment; 846.1 SY of 5" sidewalk P.C concrete; pavement markings; 48 LF of 8" DIP water main; dewatering; seeding, fertilizing and mulching; sediment control;

Posted Date

May 11, 2026

Due Date

Jun 10, 2026

Timeline Progress69%
Coffey County

Project consists of approx. 93 miles of roadway to include 4" wide yellow center line stripe, 4" wide yellow no-passing stripe and 6" wide white edge of pavement stripe.

Posted Date

May 28, 2026

Due Date

Jun 3, 2026

Timeline Progress62%
Stewart County

Supply of concrete.

Posted Date

May 20, 2025

Due Date

Jun 16, 2026

Timeline Progress96%
City of American Canyon

Work consist of 850 cy of earthwork, 1,480 cy of aggregate base, 4,060 sy of asphalt recycling, 2,580 tn of hot mix asphalt, 4,495 sf of minor concrete - sidewalk, 995 lf of minor concrete - curb and gutter, 535 sf of minor concrete - curb ramp, 275 lf of minor concrete - deepened curb, 950 lf of 12" reclaimed water main, 3 ea of 12" reclaimed water gate valve, 1 ea of reclaimed water fire hydrant, 6 ea of 2" reclaimed water service, 40 lf of 12" storm drain pipe, 235 lf of 18" storm drain pipe, 3 ea of storm drain manhole. See attached file.

Posted Date

May 26, 2026

Due Date

Jul 9, 2026

Timeline Progress13%
Washington State Department of Transportation

2026 small works roster - highway construction.

Posted Date

Jan 30, 2026

Due Date

Dec 31, 2026

Timeline Progress36%
City of Springfield

Work includes approx 990 LF of bore with 22" steel casing, sanitary sewer; 3,294 LF of 15" SDR26 PVC pipe; 1 EA sewage pumping station; 110 LF of portland cement concrete curb and gutter.

Posted Date

May 4, 2026

Due Date

Jun 8, 2026

Timeline Progress79%
Alaska Department of Transportation and Public Facilities

The project consists of performing rockfall mitigation on the Richardson Highway at MP 210.

Posted Date

May 19, 2026

Due Date

Jun 11, 2026

Timeline Progress55%
Overton County

Tires/tubes.

Posted Date

May 18, 2026

Due Date

Jun 16, 2026

Timeline Progress47%
City of Chaska

Construction of storm sewer improvements and street construction with approximately the following quantities: •1940 LF of Sanitary Sewer Pipe (HDD & Open Cut) •10 EA 48” Dia. Sanitary Manholes •175 LF of Sanitary Sewer Manhole Lining •1.35 Acres of Restoration •120 LF Storm Sewer •400 SY Bituminous Paving •.75 Acres of Clear & grub Along with traffic control, miscellaneous removals, erosion control, restoration, guard rail replacement and correlated appurtenances.

Posted Date

May 20, 2026

Due Date

Jun 18, 2026

Timeline Progress40%
Le Flore County

Bituminous materials: aggregates for bituminous surface courses and base, and traffic bound surface courses: sand-asphalt base course : blended crushed limestone and sand-reclaimed crushed asphaltic concrete- treated piling: treated bridge lumber: corrugate metal pipe (round and arched); reinforced concrete pipe: steel grader blades: nails and road oil.

Posted Date

May 21, 2026

Due Date

Jun 15, 2026

Timeline Progress43%
City of Phoenix

Work to be performed includes, but is not necessarily limited to: Remove existing striping, and install new striping; perform chip sealing; perform traffic control; and conduct construction surveying.

Posted Date

May 22, 2026

Due Date

Jun 16, 2026

Timeline Progress39%
Hughes County Rural Water District 6

Construction of a booster pump station and all appurtenances.

Posted Date

May 28, 2026

Due Date

Jul 9, 2026

Timeline Progress9%
Town of Manheim

Work induces inspection, repair and painting, inspect the entire roof for holes to include around fasteners and snow anc ice guards, repair in good order those items found for repair, paint the entire roof white using cenpeco white roofing paint.

Posted Date

May 18, 2026

Due Date

Jun 8, 2026

Timeline Progress65%
Overton County

Road striping services.

Posted Date

May 18, 2026

Due Date

Jun 16, 2026

Timeline Progress47%
Overton County

Metal and plastic pipe.

Posted Date

May 18, 2026

Due Date

Jun 16, 2026

Timeline Progress47%
Allen County

Replacing the roofs.

Posted Date

May 26, 2026

Due Date

Jun 23, 2026

Timeline Progress20%
Shawano County

The project consist of installing a new roof over the top of the existing roof on Approx. 43,200 SQ FT of roof area.

Posted Date

May 26, 2026

Due Date

Jun 2, 2026

Timeline Progress82%

Win More Highway RFPs

Get AI-powered buying signals and real-time alerts for highway opportunities

✓ Trusted by 150+ public sector sellers✓ First results in first weeks✓ Free demo available