Summary
Work includes 1,610 LF sanitary sewer main cctv inspection (pre- and post-installation); 1,610 LF sanitary sewer main cleaning; 200 LF 8" sanitary sewer main CIPP rehabilitation (6.0 mm); 1,410 LF 18" sanitary sewer main CIPP rehabilitation (9.0 mm); 5 EA remove protruding service; 7 EA sanitary sewer manhole CCCTV inspection (pre- and post-installation); 4 EA reset manhole cone, frame, and cover; 10.5 VF 60" manhole riser; 7 EA leak stoppage of excessively leaking manhole; 2 CF concrete for rebuilding manhole bench and invert; 80 VF 60" sanitary sewer manhole lining (two-part); 7 EA sanitary sewer manhole testing. See attached file.