Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Deprioritized due to audit scrutiny; expect denial and pivot to ODOT/DAS.
Coops: If your offering is on an ODOT or Ohio DAS state contract, route the purchase through that co-op.
Village of Swanton (OH). No sole source dollar threshold is cited.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Village of Swanton's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Finance Director
Village Administrator
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Village of Swanton
Roadway and utility improvements, including a new water main, fire hydrants, and valves; roadway resurfacing; and a new sidewalk along the east side.
Posted Date
Jan 23, 2026
Due Date
Feb 10, 2026
Release: Jan 23, 2026
Village of Swanton
Close: Feb 10, 2026
Roadway and utility improvements, including a new water main, fire hydrants, and valves; roadway resurfacing; and a new sidewalk along the east side.
AvailableVillage of Swanton
Work include 328 SY pavement removed; 44 CY excavation; 59 CY embankment; 6,570 Sf 4" concrete walk; 528 SF curb ramp; 1,954 SY seeding and mulching; 13 EA catch basin adjustment; 400 SY pavement repair; 7,391 SY pavement planing, asphalt concrete; 257 CY asphalt concrete surface course; 103 SY 6" non-reinforced concrete pavement; 56 LF full depth pavemnt sawing.
Posted Date
Nov 19, 2025
Due Date
Dec 16, 2025
Release: Nov 19, 2025
Village of Swanton
Close: Dec 16, 2025
Work include 328 SY pavement removed; 44 CY excavation; 59 CY embankment; 6,570 Sf 4" concrete walk; 528 SF curb ramp; 1,954 SY seeding and mulching; 13 EA catch basin adjustment; 400 SY pavement repair; 7,391 SY pavement planing, asphalt concrete; 257 CY asphalt concrete surface course; 103 SY 6" non-reinforced concrete pavement; 56 LF full depth pavemnt sawing.
Village of Swanton
Work include 146 SY concrete driveways removed; 293 SY asphalt driveways; 303 LF curb removed; 210 CY excavation; 449 LF 6" base pipe underdrains; 396 LF curb; 14 LF 12" conduit; 312 SY seeding and mulching; 3,465 SY pavement planing; 614 LF full depth pavement sawing; 45 CY asphalt concrete; 45 CY asphalt concrete base; 116 CY aggregate base 8"; 153 CY asphalt concrete surface; 8" non-reinforced concrete pavement; 402 LF removal of pavement marking; 108 LF stop line; 506 LF crosswalk line; 845 LF dotted line 8";
Posted Date
Aug 6, 2025
Due Date
Dec 16, 2025
Release: Aug 6, 2025
Village of Swanton
Close: Dec 16, 2025
Work include 146 SY concrete driveways removed; 293 SY asphalt driveways; 303 LF curb removed; 210 CY excavation; 449 LF 6" base pipe underdrains; 396 LF curb; 14 LF 12" conduit; 312 SY seeding and mulching; 3,465 SY pavement planing; 614 LF full depth pavement sawing; 45 CY asphalt concrete; 45 CY asphalt concrete base; 116 CY aggregate base 8"; 153 CY asphalt concrete surface; 8" non-reinforced concrete pavement; 402 LF removal of pavement marking; 108 LF stop line; 506 LF crosswalk line; 845 LF dotted line 8";
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.