Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include 146 SY concrete driveways removed; 293 SY asphalt driveways; 303 LF curb removed; 210 CY excavation; 449 LF 6" base pipe underdrains; 396 LF curb; 14 LF 12" conduit; 312 SY seeding and mulching; 3,465 SY pavement planing; 614 LF full depth pavement sawing; 45 CY asphalt concrete; 45 CY asphalt concrete base; 116 CY aggregate base 8"; 153 CY asphalt concrete surface; 8" non-reinforced concrete pavement; 402 LF removal of pavement marking; 108 LF stop line; 506 LF crosswalk line; 845 LF dotted line 8";
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This project primarily consists of improving off-system traffic signals.
Posted Date
Aug 24, 2025
Due Date
Feb 17, 2026
Release: Aug 24, 2025
Close: Feb 17, 2026
This project primarily consists of improving off-system traffic signals.
AvailableProvide professional engineering services for airport development projects that may include, but are not limited to, runway lighting and constant current regulator (ccr) replacement; precision approach path indicator (papi) design and installation; rotating beacon replacement; apron reconstruction design; bid and construction phase services; construction safety and phasing plan (cspp) preparation; project inspection and grant closeout; coordination with faa and adot.
Posted Date
Jul 23, 2025
Due Date
Feb 24, 2026
Release: Jul 23, 2025
Close: Feb 24, 2026
Provide professional engineering services for airport development projects that may include, but are not limited to, runway lighting and constant current regulator (ccr) replacement; precision approach path indicator (papi) design and installation; rotating beacon replacement; apron reconstruction design; bid and construction phase services; construction safety and phasing plan (cspp) preparation; project inspection and grant closeout; coordination with faa and adot.
The Alaska Department of Transportation & Public Facilities (Central Region) invites sealed bids for Glenn Highway MP 66.5 to 92 Pavement Preservation, Stage 1 (MP 83‑92), Project 0A15039/CFHWY01286. This federally funded construction will resurface MP 83‑92 and include guardrail, drainage improvements, culvert replacements, signing, and striping, with an engineer’s estimate of $10‑20 million. Bids are due February 20, 2026, at 2:00 p.m. Alaska time, and bidding documents are available via Bid Express.
Posted Date
Jan 30, 2026
Due Date
Feb 20, 2026
Release: Jan 30, 2026
Close: Feb 20, 2026
The Alaska Department of Transportation & Public Facilities (Central Region) invites sealed bids for Glenn Highway MP 66.5 to 92 Pavement Preservation, Stage 1 (MP 83‑92), Project 0A15039/CFHWY01286. This federally funded construction will resurface MP 83‑92 and include guardrail, drainage improvements, culvert replacements, signing, and striping, with an engineer’s estimate of $10‑20 million. Bids are due February 20, 2026, at 2:00 p.m. Alaska time, and bidding documents are available via Bid Express.
Provide airport engineering, planning, construction management, and environmental services. The anticipated projects over the term of the agreement may include, but are not limited to: rehabilitate, crack seal and re-mark airfield runway and ramp pavements; apron construction; terminal building and aircraft hangar construction; perimeter fencing.
Posted Date
Jan 26, 2026
Due Date
Feb 9, 2026
Release: Jan 26, 2026
Close: Feb 9, 2026
Provide airport engineering, planning, construction management, and environmental services. The anticipated projects over the term of the agreement may include, but are not limited to: rehabilitate, crack seal and re-mark airfield runway and ramp pavements; apron construction; terminal building and aircraft hangar construction; perimeter fencing.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis