Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include 328 SY pavement removed; 44 CY excavation; 59 CY embankment; 6,570 Sf 4" concrete walk; 528 SF curb ramp; 1,954 SY seeding and mulching; 13 EA catch basin adjustment; 400 SY pavement repair; 7,391 SY pavement planing, asphalt concrete; 257 CY asphalt concrete surface course; 103 SY 6" non-reinforced concrete pavement; 56 LF full depth pavemnt sawing.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This Request for Bid is for road improvements for the 2026-Patton Avenue Road Improvements Phase-II project.
Posted Date
Jan 30, 2026
Due Date
Mar 5, 2026
Release: Jan 30, 2026
Close: Mar 5, 2026
This Request for Bid is for road improvements for the 2026-Patton Avenue Road Improvements Phase-II project.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Intersection improvements at avenue.
Posted Date
Jan 24, 2026
Due Date
Feb 11, 2026
Release: Jan 24, 2026
Close: Feb 11, 2026
Intersection improvements at avenue.
AvailableDemolition of existing facilities, overhead utility lines and poles relocation, excavation, construction of reinforced concrete pipes, catch basins and inlets, grading, removal & replacement of asphalt concrete pavement, asphalt concrete overlay and concrete flatwork improvements (sidewalks, curb and gutters, curb ramps, bus pads, and driveways) landscaping, irrigation, installation of sound walls, water quality bmps, installation of traffic signals, traffic signals modifications and signing & striping, street lights, improvements.
Posted Date
Dec 23, 2025
Due Date
Feb 5, 2026
Release: Dec 23, 2025
Close: Feb 5, 2026
Demolition of existing facilities, overhead utility lines and poles relocation, excavation, construction of reinforced concrete pipes, catch basins and inlets, grading, removal & replacement of asphalt concrete pavement, asphalt concrete overlay and concrete flatwork improvements (sidewalks, curb and gutters, curb ramps, bus pads, and driveways) landscaping, irrigation, installation of sound walls, water quality bmps, installation of traffic signals, traffic signals modifications and signing & striping, street lights, improvements.
AvailableProject includes, but is not limited to: saw cutting, removal and disposal of existing asphalt, curb and sidewalk; salvaging the existing road base; asphalt milling; installation of new potable water main and reconnecting services; installation of new storm sewer; trench backfill; street, curb and sidewalk subgrade; concrete curb; asphalt sidewalk; asphalt roadway; and landscape restoration.
Posted Date
Dec 10, 2025
Due Date
Feb 11, 2026
Release: Dec 10, 2025
Close: Feb 11, 2026
Project includes, but is not limited to: saw cutting, removal and disposal of existing asphalt, curb and sidewalk; salvaging the existing road base; asphalt milling; installation of new potable water main and reconnecting services; installation of new storm sewer; trench backfill; street, curb and sidewalk subgrade; concrete curb; asphalt sidewalk; asphalt roadway; and landscape restoration.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →