Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes, but is not limited to: saw cutting, removal and disposal of existing asphalt, curb and sidewalk; salvaging the existing road base; asphalt milling; installation of new potable water main and reconnecting services; installation of new storm sewer; trench backfill; street, curb and sidewalk subgrade; concrete curb; asphalt sidewalk; asphalt roadway; and landscape restoration.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Demolition of existing facilities, overhead utility lines and poles relocation, excavation, construction of reinforced concrete pipes, catch basins and inlets, grading, removal & replacement of asphalt concrete pavement, asphalt concrete overlay and concrete flatwork improvements (sidewalks, curb and gutters, curb ramps, bus pads, and driveways) landscaping, irrigation, installation of sound walls, water quality bmps, installation of traffic signals, traffic signals modifications and signing & striping, street lights, improvements.
Posted Date
Dec 23, 2025
Due Date
Feb 5, 2026
Release: Dec 23, 2025
Close: Feb 5, 2026
Demolition of existing facilities, overhead utility lines and poles relocation, excavation, construction of reinforced concrete pipes, catch basins and inlets, grading, removal & replacement of asphalt concrete pavement, asphalt concrete overlay and concrete flatwork improvements (sidewalks, curb and gutters, curb ramps, bus pads, and driveways) landscaping, irrigation, installation of sound walls, water quality bmps, installation of traffic signals, traffic signals modifications and signing & striping, street lights, improvements.
AvailableThe Work includes the removal of existing metal bin walls, regrading the site, intalling erosion control, installing slope protection, and seeding/mulching as well as traffic control on Grand Avenue.
Posted Date
Jan 13, 2026
Due Date
Feb 24, 2026
Release: Jan 13, 2026
Close: Feb 24, 2026
The Work includes the removal of existing metal bin walls, regrading the site, intalling erosion control, installing slope protection, and seeding/mulching as well as traffic control on Grand Avenue.
AvailableIntersection improvements at avenue.
Posted Date
Jan 24, 2026
Due Date
Feb 11, 2026
Release: Jan 24, 2026
Close: Feb 11, 2026
Intersection improvements at avenue.
AvailableWork includes water treatment facility improvements (phase 2).
Posted Date
Jan 14, 2026
Due Date
Feb 12, 2026
Release: Jan 14, 2026
Close: Feb 12, 2026
Work includes water treatment facility improvements (phase 2).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis