Medfield State Hospital Roadway & Utility Infrastructure Upgrades (phase 2) RFP
Posted
Oct 28, 2026
Nov 19, 2026
Work involves installing extensive underground piping and conduit networks, including 1,760 LF of 8" PVC sanitary sewer pipe; various drainage lines comprising 330 LF of 12", 20 LF of 15", 920 LF of 18", 640 LF of 24", and 680 LF of 36" corrugated plastic pipe; water distribution mains consisting of 200 LF of 4", 300 LF of 6", and 2,100 LF of 8" ductile iron water pipe; and dry utility infrastructure featuring 9,000 LF of 4" concrete-encased telecommunication conduit alongside 9,800 LF of 5" concrete-encased electric conduit.

