Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of constructing two (2) new sewer manholes over existing sewers at the intersection of Westminster Boulevard and Springdale Street, and includes (a) removal of conflicting existing 8" VCP sewer and (b) construction of two (2) 48" diameter PVC Lined Manholes. The project will also require (but not be limited to): protecting existing utilities; coordination with utility owners, shoring, dewatering, maintaining the existing sewer flows during construction, traffic control, pavement resurfacing, slurry seal pavement as required, traffic restriping, replacement of traffic loop detectors and installation of raised pavement markers and appurtenant work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This project consists of the installation of a sanitary sewer extension along a portion of south main street.
Posted Date
Jan 6, 2026
Due Date
Jan 23, 2026
Release: Jan 6, 2026
Close: Jan 23, 2026
This project consists of the installation of a sanitary sewer extension along a portion of south main street.
AvailableProject includes 1 LS pre and post construction video inspection, 895 SY unclassified excavation, 2,356 LF remove existing 8" VCP sewer, furnish & install 12" PVC SDR-26, 3,930 LF trench shoring, 17 EA remove existing sewer manhole, install 48" dia precast sewer manhole, 68,540 SF cold milling, 620 TN asphalt pavement, 2,500 LF crack fill and crack repair. See outside link.
Posted Date
-
Due Date
Jan 13, 2026
Close: Jan 13, 2026
Project includes 1 LS pre and post construction video inspection, 895 SY unclassified excavation, 2,356 LF remove existing 8" VCP sewer, furnish & install 12" PVC SDR-26, 3,930 LF trench shoring, 17 EA remove existing sewer manhole, install 48" dia precast sewer manhole, 68,540 SF cold milling, 620 TN asphalt pavement, 2,500 LF crack fill and crack repair. See outside link.
Project includes intersection improvement to construct a roundabout with curb and gutter, curbed medians, storm sewers, multi-use path, sidewalk, curb ramps, pavement markings, signing, and lighting.
Posted Date
Jan 7, 2026
Due Date
Jan 28, 2026
Release: Jan 7, 2026
Close: Jan 28, 2026
Project includes intersection improvement to construct a roundabout with curb and gutter, curbed medians, storm sewers, multi-use path, sidewalk, curb ramps, pavement markings, signing, and lighting.
AvailableParsley Boulevard Greenway project includes installation of 640 LF of new 10-foot wide concrete sidewalk, removal of curb, gutter and sidewalk, installation of curb and gutter with asphalt patch, replacement of asphalt drive approach and installation of crushed base at alley, installation of drainage appurtenances and relocation of signage and Greenway fence.
Posted Date
Dec 11, 2025
Due Date
Jan 13, 2026
Release: Dec 11, 2025
Close: Jan 13, 2026
Parsley Boulevard Greenway project includes installation of 640 LF of new 10-foot wide concrete sidewalk, removal of curb, gutter and sidewalk, installation of curb and gutter with asphalt patch, replacement of asphalt drive approach and installation of crushed base at alley, installation of drainage appurtenances and relocation of signage and Greenway fence.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis