Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes intersection improvement to construct a roundabout with curb and gutter, curbed medians, storm sewers, multi-use path, sidewalk, curb ramps, pavement markings, signing, and lighting.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project consists of constructing two (2) new sewer manholes over existing sewers at the intersection of Westminster Boulevard and Springdale Street, and includes (a) removal of conflicting existing 8" VCP sewer and (b) construction of two (2) 48" diameter PVC Lined Manholes. The project will also require (but not be limited to): protecting existing utilities; coordination with utility owners, shoring, dewatering, maintaining the existing sewer flows during construction, traffic control, pavement resurfacing, slurry seal pavement as required, traffic restriping, replacement of traffic loop detectors and installation of raised pavement markers and appurtenant work.
Posted Date
Nov 21, 2025
Due Date
Jan 20, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 20, 2026
Project consists of constructing two (2) new sewer manholes over existing sewers at the intersection of Westminster Boulevard and Springdale Street, and includes (a) removal of conflicting existing 8" VCP sewer and (b) construction of two (2) 48" diameter PVC Lined Manholes. The project will also require (but not be limited to): protecting existing utilities; coordination with utility owners, shoring, dewatering, maintaining the existing sewer flows during construction, traffic control, pavement resurfacing, slurry seal pavement as required, traffic restriping, replacement of traffic loop detectors and installation of raised pavement markers and appurtenant work.
AvailableBids are invited for furnishing the labor, materials, and equipment for the Cox Road and Kingsgate Way roundabout project.
Posted Date
Jan 7, 2026
Due Date
Jan 22, 2026
Release: Jan 7, 2026
Close: Jan 22, 2026
Bids are invited for furnishing the labor, materials, and equipment for the Cox Road and Kingsgate Way roundabout project.
AvailableConstruction services for the CSAH 23/CSAH 68 Roundabout Project, including roadway, drainage, and pedestrian infrastructure.
Posted Date
Jan 7, 2026
Due Date
Feb 3, 2026
Release: Jan 7, 2026
Close: Feb 3, 2026
Construction services for the CSAH 23/CSAH 68 Roundabout Project, including roadway, drainage, and pedestrian infrastructure.
AvailableWork includes 1 LS clearing and grubbing; 5,951 CY excavation; 8,144 SY curing coat; 11,076 SF 4" concrete walk; 45 SF curb ramp; 267 SY repair seeding and mulching; 12 MSF mowing; 230 SY ditch erosion protection mat, type b; 200,000 EA erosion control; 87 SY pavement planing, asphalt concrete; 689 GAL non-tracking tack coat; 35 CY asphalt concrete surface course; 275 LF combination curb and gutter, type 9; 235 LF 12" conduit, type b; 2 EA manhole; 536 LF 12" water main ductile iron pipe ansi class 52, push-on joints and fittings; 975 LF trench, 24" deep; 112 SY riprap, misc. ; 148. 45 SF sign, flat sheet; 0.32 mile center line; 72 LF yield line.
Posted Date
Dec 5, 2025
Due Date
Jan 20, 2026
Release: Dec 5, 2025
Close: Jan 20, 2026
Work includes 1 LS clearing and grubbing; 5,951 CY excavation; 8,144 SY curing coat; 11,076 SF 4" concrete walk; 45 SF curb ramp; 267 SY repair seeding and mulching; 12 MSF mowing; 230 SY ditch erosion protection mat, type b; 200,000 EA erosion control; 87 SY pavement planing, asphalt concrete; 689 GAL non-tracking tack coat; 35 CY asphalt concrete surface course; 275 LF combination curb and gutter, type 9; 235 LF 12" conduit, type b; 2 EA manhole; 536 LF 12" water main ductile iron pipe ansi class 52, push-on joints and fittings; 975 LF trench, 24" deep; 112 SY riprap, misc. ; 148. 45 SF sign, flat sheet; 0.32 mile center line; 72 LF yield line.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.