Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Cedar Falls
This Project involves the construction of portions of two (2) city streets totaling .31 mile(s), sidewalk ADA ramp reconstruction, storm sewer, and watermain construction. Work will include 7,654 SY of pavement removal and replacement, replacement of pedestrian ramps, modification to existing storm sewer intakes, manhole replacements, grading, sodding, and pavement striping.
Posted Date
Mar 3, 2026
Due Date
Mar 20, 2026
Release: Mar 3, 2026
City of Cedar Falls
Close: Mar 20, 2026
This Project involves the construction of portions of two (2) city streets totaling .31 mile(s), sidewalk ADA ramp reconstruction, storm sewer, and watermain construction. Work will include 7,654 SY of pavement removal and replacement, replacement of pedestrian ramps, modification to existing storm sewer intakes, manhole replacements, grading, sodding, and pavement striping.
AvailableCity of Cedar Falls
Roadway improvements include reconstruction of street and sidewalk infill. The new pavement will be 7" thick Portland cement concrete with a 12" granular subbase. The product will also include water main replacement, sanitary sewer manhole replacements, subdrains, storm sewer intakes, storm sewer manholes, and painted pavement markings.
Posted Date
Mar 3, 2026
Due Date
Mar 20, 2026
Release: Mar 3, 2026
City of Cedar Falls
Close: Mar 20, 2026
Roadway improvements include reconstruction of street and sidewalk infill. The new pavement will be 7" thick Portland cement concrete with a 12" granular subbase. The product will also include water main replacement, sanitary sewer manhole replacements, subdrains, storm sewer intakes, storm sewer manholes, and painted pavement markings.
AvailableCity of Cedar Falls
Construction of portions of seven (7) city streets totaling 1.25 mile(s) and sidewalk reconstruction. Work will include 1930 tons of asphalt placement, replacement of pedestrian ramps, modifications to existing storm sewer intakes, manhole adjustments, grading, sod and seeding, and pavement striping.
Posted Date
Mar 3, 2026
Due Date
Mar 20, 2026
Release: Mar 3, 2026
City of Cedar Falls
Close: Mar 20, 2026
Construction of portions of seven (7) city streets totaling 1.25 mile(s) and sidewalk reconstruction. Work will include 1930 tons of asphalt placement, replacement of pedestrian ramps, modifications to existing storm sewer intakes, manhole adjustments, grading, sod and seeding, and pavement striping.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $15,000, use sole source. Otherwise pivot to a formal, public bid.
Coops: Not used today; ask if Iowa DAS Master Agreements, NASPO ValuePoint, Sourcewell, or HGACBuy could be considered.
City of Cedar Falls, IA: No evidence of sole source usage for significant awards. Sole source ceiling is $15,000, making this path impractical for larger buys.
Board meetings and strategic plans from City of Cedar Falls
The Future Forward 2025 Community-Wide Strategic Plan for Cedar Falls aims to advance the city's economic vitality, quality of life, and community well-being. Its strategic pillars focus on strengthening the business climate, enhancing retail and service amenities, developing riverfront attractions, diversifying housing options, supporting a local food co-op, improving public spaces, ensuring comprehensive wellness and healthcare, advancing technology and transportation connectivity, promoting environmental sustainability, enriching arts and culture, fostering North Cedar development, deepening university engagement, cultivating community inclusiveness, encouraging regional collaboration, and leading in education for all ages.
The Community-Wide Strategic Plan 2016, also known as Future Forward 2025, outlines Cedar Falls' vision for the year 2025. It focuses on enhancing the community's prosperity through innovation, job growth, and a diversified tax base. The plan aims to improve the quality of place by focusing on lifestyle amenities, wellness services, connectivity, sustainability, and cultural offerings. It also seeks to enhance the quality of life for its people through community engagement, inclusivity, regional collaboration, and education.
This work session focused on reviewing and discussing the proposed downtown zoning code. The session was structured into four parts to allow for thorough review. Key discussion points included the regulating plan, building standards, and the overall process for implementing and improving the zoning code. The regulating plan was described as a place-specific zoning map organized by frontages, with rules varying based on street orientation. Building form standards, building heights, placement, and uses were also discussed. The session also touched upon the reception of form-based codes in other communities and their impact on economic development.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Cedar Falls's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across City of Cedar Falls's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database