Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Riverside
Project includes 1 LS pre and post construction video inspection, 895 SY unclassified excavation, 2,356 LF remove existing 8" VCP sewer, furnish & install 12" PVC SDR-26, 3,930 LF trench shoring, 17 EA remove existing sewer manhole, install 48" dia precast sewer manhole, 68,540 SF cold milling, 620 TN asphalt pavement, 2,500 LF crack fill and crack repair. See outside link.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of Riverside
Project includes 1 LS pre and post construction video inspection, 895 SY unclassified excavation, 2,356 LF remove existing 8" VCP sewer, furnish & install 12" PVC SDR-26, 3,930 LF trench shoring, 17 EA remove existing sewer manhole, install 48" dia precast sewer manhole, 68,540 SF cold milling, 620 TN asphalt pavement, 2,500 LF crack fill and crack repair. See outside link.
Posted Date
-
Due Date
Dec 22, 2025
City of Riverside
Close: Dec 22, 2025
Project includes 1 LS pre and post construction video inspection, 895 SY unclassified excavation, 2,356 LF remove existing 8" VCP sewer, furnish & install 12" PVC SDR-26, 3,930 LF trench shoring, 17 EA remove existing sewer manhole, install 48" dia precast sewer manhole, 68,540 SF cold milling, 620 TN asphalt pavement, 2,500 LF crack fill and crack repair. See outside link.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Jackson
Includes installation of 8” sanitary sewer main and manholes, 12” water main, services, 18” storm sewer main and manholes, sidewalk, curb and gutter, street lighting, asphalt surface restoration, concrete surface restoration, and grass surface restoration.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
Town of Jackson
Close: Dec 18, 2025
Includes installation of 8” sanitary sewer main and manholes, 12” water main, services, 18” storm sewer main and manholes, sidewalk, curb and gutter, street lighting, asphalt surface restoration, concrete surface restoration, and grass surface restoration.
AvailablePottawatomie County
Sewer, Water & Street Improvements.
Posted Date
Nov 13, 2025
Due Date
Dec 15, 2025
Release: Nov 13, 2025
Pottawatomie County
Close: Dec 15, 2025
Sewer, Water & Street Improvements.
AvailablePottawatomie County
Sewer, Water & Street Improvements.
Posted Date
Nov 13, 2025
Due Date
Dec 15, 2025
Release: Nov 13, 2025
Pottawatomie County
Close: Dec 15, 2025
Sewer, Water & Street Improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →