Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project consists of the installation of a sanitary sewer extension along a portion of south main street.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The project includes the following work: extend 12" sanitary sewer main south from the city's existing 24" sewer main, continuing with a bore under highway for a total of about 1,600 LF of 12" sanitary sewer main.
Posted Date
Jan 6, 2026
Due Date
Feb 5, 2026
Release: Jan 6, 2026
Close: Feb 5, 2026
The project includes the following work: extend 12" sanitary sewer main south from the city's existing 24" sewer main, continuing with a bore under highway for a total of about 1,600 LF of 12" sanitary sewer main.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
2,500 LF of trenchless 8" sanitary sewer main and 7 manholes.
Posted Date
Jan 7, 2026
Due Date
Jan 22, 2026
Release: Jan 7, 2026
Close: Jan 22, 2026
2,500 LF of trenchless 8" sanitary sewer main and 7 manholes.
AvailableThe work includes: installation of gravity and force main sewer pipes, sewer manholes, air release manholes, pump station, trench repair, earthwork, and all associated work as shown on the contract drawings and documents. The work also includes trenching, backfilling, and road pavement repair associated with utility installation. The work includes, but is not limited to: The installation of 2,000 LF of gravity sewer, 1,530 LF of new sewer force main, installation of precast manholes, installation of residential services, and associated construction; Road repair, including the removal of bituminous pavement, trench paving, street reconstruction, loam, and seeding; Installation of the pump station, valve pit, electrical controls, emergency generator, and drive for access to the pump station.
Posted Date
Dec 8, 2025
Due Date
Jan 14, 2026
Release: Dec 8, 2025
Close: Jan 14, 2026
The work includes: installation of gravity and force main sewer pipes, sewer manholes, air release manholes, pump station, trench repair, earthwork, and all associated work as shown on the contract drawings and documents. The work also includes trenching, backfilling, and road pavement repair associated with utility installation. The work includes, but is not limited to: The installation of 2,000 LF of gravity sewer, 1,530 LF of new sewer force main, installation of precast manholes, installation of residential services, and associated construction; Road repair, including the removal of bituminous pavement, trench paving, street reconstruction, loam, and seeding; Installation of the pump station, valve pit, electrical controls, emergency generator, and drive for access to the pump station.
AvailableConstruction contract for Main Street sewer extension: install ~2,000 linear feet of gravity sewer, ~1,530 linear feet of sewer force main, precast and air release manholes, residential services, pump station (valve pit, electrical controls, emergency generator), trenching, backfill, earthwork, and road/trench paving and restoration. Requires bidder qualifications, 5% bid bond, 100% performance/payment bonds, and a mandatory pre-bid conference.
Posted Date
Dec 8, 2025
Due Date
Jan 14, 2026
Release: Dec 8, 2025
Close: Jan 14, 2026
Construction contract for Main Street sewer extension: install ~2,000 linear feet of gravity sewer, ~1,530 linear feet of sewer force main, precast and air release manholes, residential services, pump station (valve pit, electrical controls, emergency generator), trenching, backfill, earthwork, and road/trench paving and restoration. Requires bidder qualifications, 5% bid bond, 100% performance/payment bonds, and a mandatory pre-bid conference.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.