Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction contract for Main Street sewer extension: install ~2,000 linear feet of gravity sewer, ~1,530 linear feet of sewer force main, precast and air release manholes, residential services, pump station (valve pit, electrical controls, emergency generator), trenching, backfill, earthwork, and road/trench paving and restoration. Requires bidder qualifications, 5% bid bond, 100% performance/payment bonds, and a mandatory pre-bid conference.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
The work includes: installation of gravity and force main sewer pipes, sewer manholes, air release manholes, pump station, trench repair, earthwork, and all associated work as shown on the contract drawings and documents. The work also includes trenching, backfilling, and road pavement repair associated with utility installation. The work includes, but is not limited to: The installation of 2,000 LF of gravity sewer, 1,530 LF of new sewer force main, installation of precast manholes, installation of residential services, and associated construction; Road repair, including the removal of bituminous pavement, trench paving, street reconstruction, loam, and seeding; Installation of the pump station, valve pit, electrical controls, emergency generator, and drive for access to the pump station.
Posted Date
Dec 8, 2025
Due Date
Jan 14, 2026
Release: Dec 8, 2025
Close: Jan 14, 2026
The work includes: installation of gravity and force main sewer pipes, sewer manholes, air release manholes, pump station, trench repair, earthwork, and all associated work as shown on the contract drawings and documents. The work also includes trenching, backfilling, and road pavement repair associated with utility installation. The work includes, but is not limited to: The installation of 2,000 LF of gravity sewer, 1,530 LF of new sewer force main, installation of precast manholes, installation of residential services, and associated construction; Road repair, including the removal of bituminous pavement, trench paving, street reconstruction, loam, and seeding; Installation of the pump station, valve pit, electrical controls, emergency generator, and drive for access to the pump station.
AvailableSewer force main replacement project.
Posted Date
Nov 5, 2025
Due Date
Dec 12, 2025
Release: Nov 5, 2025
Close: Dec 12, 2025
Sewer force main replacement project.
Work includes : 12 EA sanitary manhole; 1 EA sanitary manhole (straddle); 13 EA manhole frame & cover; 75 LF 6" gravity sewer - sdr 26 pvc; 2,030 LF 8" gravity sewer line - sdr 35 pvc; see attached file.
Posted Date
Dec 4, 2025
Due Date
Dec 16, 2025
Release: Dec 4, 2025
Close: Dec 16, 2025
Work includes : 12 EA sanitary manhole; 1 EA sanitary manhole (straddle); 13 EA manhole frame & cover; 75 LF 6" gravity sewer - sdr 26 pvc; 2,030 LF 8" gravity sewer line - sdr 35 pvc; see attached file.
AvailableRelease: Nov 24, 2025
Close: Dec 16, 2025
Sewer extension project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis