Special DistrictFL
Posted
Oct 5, 2026
Oct 29, 2026
Murder Creek Waterline Improvements RFP
Work include approx 4,000 LF of 10" water main with associated water services and appurtenances.
Description: The City and Borough of Juneau seeks proposals from qualified consultants to design the Upper Creek Street Waterline Replacement project. The consultant will prepare bid-ready construction drawings, specifications, a bid schedule, and an engineer’s estimate for the 2027 construction season, including research, survey, engineering design, and stakeholder and neighborhood coordination. A pre-proposal conference call is scheduled for September 29, 2026, at 10:00 a.m., and proposals are due online by October 15, 2026, at 2:00 p.m. Alaska time.
City · AK, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Special DistrictFL
Posted
Oct 5, 2026
Oct 29, 2026
Work include approx 4,000 LF of 10" water main with associated water services and appurtenances.
CityTX
Posted
-
Nov 3, 2026
The City of Farmers Branch seeks qualifications from engineering firms to provide full design services for replacing about 2,984 linear feet of aging cast-iron waterline with PVC mains in a residential neighborhood. The scope includes surveying, environmental review, subsurface utility engineering, construction-document preparation, bidding assistance, construction administration, testing, disinfection, and as-built documentation. The project is partially funded by an EPA Region 6 Community Grant; submissions are due November 3, 2026, and a recommended pre-bid conference is scheduled for October 20, 2026.
CityIN
Posted
Sep 14, 2026
Oct 20, 2026
The proposed construction will include existing structure removal and installation of twin 76’ 15’ x 8’ coated reinforced concrete box culverts. Additional work consists of installation revetment riprap at each end of new culvert, asphalt overlay, and all incidental work required, as specified in the Contract Document and Plans.
CityCO
Posted
Oct 2, 2026
Oct 15, 2026
Project includes the following work: replacement of 180 LF of waterline. Scope include furnishing and installation of two insertion valves, two couplings and two disinfection taps, along with construction and testing procedures fully aligned with the town standards and specifications.
Decision makers connected to this RFP from City and Borough of Juneau.