Forsythe Street over Hurricane Creek Structure Replacement RFP
Posted
Sep 14, 2026
Oct 20, 2026
The proposed construction will include existing structure removal and installation of twin 76’ 15’ x 8’ coated reinforced concrete box culverts. Additional work consists of installation revetment riprap at each end of new culvert, asphalt overlay, and all incidental work required, as specified in the Contract Document and Plans.