Route 19 Waterline Replacement Project
2 ea Connect to 8" Waterline with Tapping Sleeve & Valve; 3 ea Connect to 12" Waterline with Tapping Sleeve & Valve; 4 ea Remove Existing Fire Hydrant and Deliver to Township; 5 ea Fire Hydrant Installation (Valve, Tee, Line and Hydrant); 110 LF of 1" HDPE SDR-9 Service Line with Tracer Wire; 1 ea 2" Service Connection (Curb Box, Corp. Stop, Bushing & Reconnection); 20 LF 2" HDPE SDR-9 Service Line with Tracer Wire; 2 ea of 1.5" Service Connection (Curb Box, Corp. Stop, Bushing & Reconnection); 10 LF of 1.5" HDPE SDR-9 Service Line with Tracer Wire; 2,200 LF of 12" PVC C-900 DR-14 Waterline; 2,300 LF of 8" PVC C-900 DR-14 Waterline; 20 LF of 6" PVC C-900 DR-14 Waterline; 10 LF concrete encasement; 6,340 LF Saw Cut Asphalt Road; 160 LF Remove and Replace Guiderail. See attached file.