Closing soon

Flores and North Drive Waterline Replacement Project

Description: Work consists of installation of approx 7,800 LF of 8" water main, fire hydrants, valves, pavement replacement and other related improvements. Work also includes 222 LF of install 6" c900 PVC waterline; 7,806 LF of install 8" c900 PVC waterline; 45 LF of install 4" c900 waterline; 9,324 LF of excavate and backfill trench w/native soil for waterline; 643 CY of backfill trench w/asphalt base for waterline; 5 CY of install 1 1/4" ab material for vertical realignment; 2114 LF of sawcut existing pavement for waterline trench; 892 SY of replace asphalt to match existing thickness, 3" min; 892 SY of remove sawcut asphalt; 453 SF of remove existing concrete sidewalk.

Buyer
City of Show Low

City · AZ, US

Released
Sep 25, 2026
Closes
Oct 14, 2026(11 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts