North Forest Grove Road Waterline Replacement
Posted
-
Oct 8, 2026
Work include 5 EA test hole excavation (as directed); 8 LF 16 inch c900 pvc pipe and D.I. Fittings; 200 LF 12 inch c900 PVC pipe and D.I. Fittings; 1,700 LF 8" c900 PVC pipe and D.I. Fittings; 30 LF 6" c900 PVC pipe and D.I. Fittings; 400 LF polywrap pipe encasement (D.I. Fittings only, size varies); 20 EA 12" mechanical joint restraint (megalug PVC to MJ); 100 EA 8" mechanical joint restraint (megalug PVC to MJ); 20 EA 6" mechanical joint restraint (megalug PVC to mj); 85 EA 8" external bell harness joint restraint. See outside link.

