Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Robinson Township Municipal (Sewer And Water) Authority's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Treasurer
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Robinson Township Municipal (Sewer And Water) Authority
Waterline replacement.
Posted Date
Jan 15, 2026
Due Date
Feb 5, 2026
Release: Jan 15, 2026
Robinson Township Municipal (Sewer And Water) Authority
Close: Feb 5, 2026
Waterline replacement.
AvailableRobinson Township Municipal (Sewer And Water) Authority
The work generally includes the demolition of an existing sewage pump station and the construction/installation of a new sewage pump station. Work also includes furnishing all labor, tools and materials, purchase, delivery, and installation of all equipment, site preparation and cleanup, and testing. Work has been divided into two (2) Contracts, General and Electrical (already awarded).
Posted Date
-
Due Date
Oct 8, 2025
Release: -
Robinson Township Municipal (Sewer And Water) Authority
Close: Oct 8, 2025
The work generally includes the demolition of an existing sewage pump station and the construction/installation of a new sewage pump station. Work also includes furnishing all labor, tools and materials, purchase, delivery, and installation of all equipment, site preparation and cleanup, and testing. Work has been divided into two (2) Contracts, General and Electrical (already awarded).
Robinson Township Municipal (Sewer And Water) Authority
Work consists of 2,623 LF 8" Cured-In-Place (CIPP) Pipe. Includes Cleaning, Root Removal, Pre and Post Lining CCTV Inspections; 24 EA Hydrophilic Waterstops at Manholes (Required at All Manholes); 40 LF Open-Cut Remove and Replace Pipe with 8" SDR-35 PVC (As Directed); 75 SY Asphalt Pavement Restoration.
Posted Date
-
Due Date
Aug 7, 2025
Release: -
Robinson Township Municipal (Sewer And Water) Authority
Close: Aug 7, 2025
Work consists of 2,623 LF 8" Cured-In-Place (CIPP) Pipe. Includes Cleaning, Root Removal, Pre and Post Lining CCTV Inspections; 24 EA Hydrophilic Waterstops at Manholes (Required at All Manholes); 40 LF Open-Cut Remove and Replace Pipe with 8" SDR-35 PVC (As Directed); 75 SY Asphalt Pavement Restoration.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.