Work consists of installation of approx 7,800 LF of 8" water main, fire hydrants, valves, pavement replacement and other related improvements. Work also includes 222 LF of install 6" c900 PVC waterline; 7,806 LF of install 8" c900 PVC waterline; 45 LF of install 4" c900 waterline; 9,324 LF of excavate and backfill trench w/native soil for waterline; 643 CY of backfill trench w/asphalt base for waterline; 5 CY of install 1 1/4" ab material for vertical realignment; 2114 LF of sawcut existing pavement for waterline trench; 892 SY of replace asphalt to match existing thickness, 3" min; 892 SY of remove sawcut asphalt; 453 SF of remove existing concrete sidewalk.