Rockefeller Road Waterline Replacement
Posted
Sep 11, 2026
Oct 7, 2026
Work includes approx 2,534 LF 12" PVCO water main AWWA c909; 22 EA 1" water service connection, long side; 993 LF concrete curb; 6,479 SF 6" remove and replace existing concrete walk/drive/apron.
