Bayport Waterline Replacement Phase Iv Project
Posted
Jul 17, 2026
Oct 22, 2026
This project involves the replacement of approx 15,750 LF of 8" through 24" transmission waterlines, including a 48" magnetic flow meter, valves, fittings, and associated appurtenances with trenchless installation at designated crossings.

