Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Coastal Water Authority
Provide construction manager-at-risk (cmar) services. Services will be provided under a single contract encompassing both pre-construction and construction phases for the facilities improvement project (phase 1: lps, trps, cms). See outside link.
Posted Date
-
Due Date
Jun 12, 2026
Coastal Water Authority
Close: Jun 12, 2026
Provide construction manager-at-risk (cmar) services. Services will be provided under a single contract encompassing both pre-construction and construction phases for the facilities improvement project (phase 1: lps, trps, cms). See outside link.
AvailableCoastal Water Authority
The Coastal Water Authority is soliciting sealed bids to recondition one 1,000 HP electric motor (P-11) used at the Trinity River Pump Station; the work includes removal, transport to contractor facility, rewinding/repair, testing, and reinstallation with field commissioning. Sealed bids are due March 27, 2026 at 10:00 AM local time and will be publicly opened at Coastal Water Authority’s office in Houston. The contract period for completion is 90 calendar days from the commencement date and the solicitation includes bid bond and, if applicable, performance and payment bond requirements.
Posted Date
Mar 13, 2026
Due Date
Mar 27, 2026
Release: Mar 13, 2026
Coastal Water Authority
Close: Mar 27, 2026
The Coastal Water Authority is soliciting sealed bids to recondition one 1,000 HP electric motor (P-11) used at the Trinity River Pump Station; the work includes removal, transport to contractor facility, rewinding/repair, testing, and reinstallation with field commissioning. Sealed bids are due March 27, 2026 at 10:00 AM local time and will be publicly opened at Coastal Water Authority’s office in Houston. The contract period for completion is 90 calendar days from the commencement date and the solicitation includes bid bond and, if applicable, performance and payment bond requirements.
Coastal Water Authority
Coastal Water Authority is soliciting sealed bids to repair/recondition one 66,000 GPM vertical mixed flow water pump (P-11) serving the Trinity River Pump Station in Dayton, Texas. Work includes removal, transport to and from the contractor’s facility, repair per specifications, testing, and reinstallation. Bids are due at 10:00 a.m. local time on March 27, 2026, at CWA’s Houston office.
Posted Date
-
Due Date
Mar 27, 2026
Coastal Water Authority
Close: Mar 27, 2026
Coastal Water Authority is soliciting sealed bids to repair/recondition one 66,000 GPM vertical mixed flow water pump (P-11) serving the Trinity River Pump Station in Dayton, Texas. Work includes removal, transport to and from the contractor’s facility, repair per specifications, testing, and reinstallation. Bids are due at 10:00 a.m. local time on March 27, 2026, at CWA’s Houston office.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Coastal Water Authority
This strategic plan outlines the Coastal Water Authority's commitment to safely, efficiently, and reliably deliver surface water to the City of Houston and its industrial customers. It emphasizes maintaining operational excellence through robust asset management, advanced data analytics, and continuous personnel training. Key strategic pillars include fostering strong stakeholder engagement, ensuring system redundancy and reliability through planned capital improvement projects, and securing external funding. The plan is guided by principles of excellent service, continuous improvement, and transparency, aiming to ensure an uninterrupted supply of surface water and uphold CWA's regional leadership.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Coastal Water Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Electrical Instrumentation Control Manager
Premium
Access the largest public sector contact database
© 2026 Starbridge