Alabama Department of Transportation
Special DistrictAL
Posted
Nov 15, 2026
Dec 4, 2026
Micro-milling, Resurfacing (scrub Seal), Patching, Guardrail Installation, and Traffic Stripe On Sr-25 From the Junction of Sr-3 (us-31) To the Juncti RFP
Work inlcudes 163 LF removing guardrail; 12 EA removing guardrail end anchor (all type); 159 CY unclassified excavation; 119 CY borrow excavation (loose truckbed measurement); 6,090 GAL tack coat; 41,620 SY micro-milling existing pavement (approximately 1.10" thru 2.
