Alabama Department of Transportation
Special DistrictAL
Posted
Nov 19, 2026
Dec 4, 2026
Planing, Resurfacing, Centerline Scoring, and Traffic Stripe On Sr-21 RFP
Work inlcudes 8,663 GL tack coat; 86,625 SY planing existing pavement (approximately 1.10" thru 2.0" thick); 7,258 TN superpave bituminous concrete wearing surface layer, 3/4" maximum aggregate size mix, esal range a/b; 103 TN superpave bituminous concrete wearing surface layer, widening, 3/4" maximum aggregate size mix, esal range a/b; 800 TN superpave bituminous concrete upper binder layer, patching, 1" maximum aggregate size mix, esal range a/b. See attached file.
