DEMOF-RPF-NHF-PRF-A210(943) - Constructing the Bridge Replacement and Approaches RFP
Aug 1, 2026
Closes
Aug 28, 2026
Work includes approx. 1 LS clearing and grubbing, 88,738 CY unclassified excavation, 6,972 SY geosynthetic reinforcement for reinforced slopes, 4,637 Gal tack coat, 54,325 SY bituminous treatment A, 1,370 SY reinforced cement concrete bridge end slab, 2 EA steel test piles (HP 12x53), 45,676 LB structural steel, 5,160 LF bridge barrier rail, 1,384 LF 18" RC storm sewer pipe, 60 LF 15" roadway pipe rehabilitation, 2,513 SF soldier pile retaining wall, 2,995 SY 4" concrete sidewalk, 7 EA manhole, 4,650 LF steel beam guardrail, 888 LF 16" DI water main laid, 3 EA 2" air release valve, seeding, mowing, pavement marking, 4,650 LF steel beam guardrail, 19 AC pest control treatment, 85 LF roadway sign, 965 LF 24F fiber optic trunk cable, 6 EA ITS pole mount cabinet, 4 EA electrical power service, 1 LS roadway lighting.