Micro-Milling, Resurfacing, Bridge Rail Retrofit, Bridge Guardrail Retrofit, Bridge Deck Repairs, Concrete Slab Replacement, and Traffic Stripe RFP
Posted
Aug 29, 2026
Sep 25, 2026
Work includes removal of old bridge, 6,100 LF removing guardrail, 205 LF removing safety barrier, 29 EA removing guardrail end anchor, 802 gal tack coat, 869 SY planing existing pavement (approx 2.10" thru 3.0" thick), 94,630 SY micro-milling existing pavement (approx 1.10" thru 2.00" thick), material remixing device, 4,813 Ton polymer modified open graded friction course, 14,194 Gal open graded friction course tack coat, superpave bituminous concrete wearing surface layer, leveling, 3/8" maximum aggregate size mix, esal range c/d 441 Ton, 25,076 SY high density mineral bond, 600 SY removal of concrete pavement slab. See attached file.