Bridge Replacement (Grading, Drain-age, Pavement, Bridge Removal, and Traffic Signals)
Posted
Sep 4, 2026
Sep 25, 2026
Work inlcudes 275 SY removing concrete driveway; 307 LF removing pipe; 1,863 LF removing guardrail; 171 LF removing concrete flume; 6 EA removing headwalls; 4 EA removing guardrail end anchor (all type); 28,468 CY unclassified excavation; 125,465 CY borrow excavation; 607 CY borrow excavation (underwater backfill); 1,099 CY borrow excavation (underwater embankment); 9,100 SY crushed aggregate base course, type b, plant mixed, 6" compacted thickness; 30,540 SY bituminous treatment a. See attached file.