Alabama Department of Transportation
Special DistrictAL
Posted
Nov 18, 2026
Dec 4, 2026
Planing, Resurfacing, and Traffic Stripe on SR-193 RFP
Work inlcudes 424 LF removing raised curb channelizer; 24 EA removing guardrail end anchor (all type); 25,432 GAL tack coat; 254,315 SY planing existing pavement (approximately 1.10" thru 2.0" thick); 1 EA material remixing device; 20,509 TN superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range c/d; 528 TN superpave bituminous concrete wearing surface layer, widening, 1/2" maximum aggregate size mix, esal range c/d. See attached file.
