Alabama Department of Transportation
State AgencyAL
Posted
Nov 9, 2026
Dec 4, 2026
Description: Work includes 863 LF removing guardrail; 14 EA removing guardrail end anchor (all type); 11,111 GAL tack coat; 111,103 SY micro-milling existing pavement (approximately 1.10" thru 2.00" thick); 1 EA material remixing device; 8,839 TN superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range c/d; 328 TN superpave bituminous concrete wearing surface layer, widening, 1/2" maximum aggregate size mix, esal range c/d. See attached file.
SpecialDistrict · AL, US
Decision makers connected to this RFP from Alabama Department of Transportation.
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
Alabama Department of Transportation
State AgencyAL
Posted
Nov 9, 2026
Dec 4, 2026
The Alabama Department of Transportation is soliciting construction work on an 11.795-mile section of SR-59 in Baldwin County, from the intersection of CR-80 to the Monroe County Line. The work includes micro-milling and resurfacing, guardrail installation with steel blockout replacement, and traffic striping. The contract time is 60 working days.
Alabama Department of Transportation
Special DistrictAL
Posted
Nov 18, 2026
Dec 4, 2026
Work inlcudes 21,257 GAL tack coat; 213,751 SY micro-milling existing pavement (approximately 1.10" thru 2.00" thick); 16,323 TN superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range c/d; 3,104 TN superpave bituminous concrete wearing surface layer, widening, 1/2" maximum aggregate size mix, esal range c/d; 500 TN superpave bituminous concrete upper binder layer, patching, 1" maximum aggregate size mix, esal range c/d; 1,000 TN superpave bituminous concrete upper binder layer, leveling, 1/2" maximum aggregate size mix, esal range c/d. See attached file.
Alabama Department of Transportation
Special DistrictAL
Posted
Nov 19, 2026
Dec 4, 2026
Work includes 4,669 GAL tack coat; 46,691 SY micro-milling existing pavement (approximately 1.10" thru 2.00" thick); 3,851 TN superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range a/b; 500 TN superpave bituminous concrete upper binder layer, patching, 1" maximum aggregate size mix, esal range a/b; 500 ton superpave bituminous concrete upper binder layer, leveling, 1/2" maximum aggregate size mix, esal range a/b. See attached file.
Alabama Department of Transportation
Special DistrictAL
Posted
Nov 13, 2026
Dec 4, 2026
Work includes 182 LF removing guardrail; 36 EA removing guardrail end anchor (all type); 23 STA machine grading shoulders; 19,932 GAL tack coat; 199,319 SY micro-milling existing pavement (approximately 0.00" thru 1.00" thick); 10,831 TN superpave bituminous concrete wearing surface layer, 3/8" maximum aggregate size mix, ESAL range c/d; 132 TN superpave bituminous concrete wearing surface layer, widening, 3/8" maximum aggregate size mix, ESAL range c/d; 250 TN superpave bituminous concrete upper binder layer, patching, 1/2" maximum aggregate size mix, ESAL range c/d. See attached file.