Alabama Department of Transportation
Special DistrictAL
Posted
Nov 19, 2026
Dec 4, 2026
Micro-milling, Resurfacing, and Traffic Stripe On Sr-33 RFP
Work includes 4,669 GAL tack coat; 46,691 SY micro-milling existing pavement (approximately 1.10" thru 2.00" thick); 3,851 TN superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range a/b; 500 TN superpave bituminous concrete upper binder layer, patching, 1" maximum aggregate size mix, esal range a/b; 500 ton superpave bituminous concrete upper binder layer, leveling, 1/2" maximum aggregate size mix, esal range a/b. See attached file.
