Alabama Department of Transportation
Special DistrictAL
Posted
Nov 18, 2026
Dec 4, 2026
Micro-milling, Resurfacing, and Traffic Stripe On Sr-13 RFP
Work inlcudes 21,257 GAL tack coat; 213,751 SY micro-milling existing pavement (approximately 1.10" thru 2.00" thick); 16,323 TN superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range c/d; 3,104 TN superpave bituminous concrete wearing surface layer, widening, 1/2" maximum aggregate size mix, esal range c/d; 500 TN superpave bituminous concrete upper binder layer, patching, 1" maximum aggregate size mix, esal range c/d; 1,000 TN superpave bituminous concrete upper binder layer, leveling, 1/2" maximum aggregate size mix, esal range c/d. See attached file.
