Alabama Department of Transportation
Special DistrictAL
Posted
Nov 18, 2026
Dec 4, 2026
Access Management and Interchange Improvements (Grading, Drainage, Pavement, Sign Installation, and Traffic Stripe) RFP
Work inlcudes 161 LF removing pipe; 1,009 LF removing curb and gutter; 5 EA removing headwalls; 2 EA mailbox reset, single; 1,925 CY unclassified excavation; 1,524 CY borrow excavation (loose truckbed measurement); 1,013 TN borrow excavation (underwater embankment); 59 CY structure excavation; 43 CY foundation backfill, commercial; 2,642 SY crushed aggregate base course, type b, plant mixed, 6" compacted thickness; 2,642 SY bituminous treatment a. See attached file.
