Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
National Center for Education Statistics identifier.
Total number of schools in the district.
School mascot.
Total number of staff members.
Highest grade level offered.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Upland Unified School District
Project includes but is not limited to: interior renovations to vocational classroom N257 and storage N257B located in building N north and the construction of an adjacent outdoor structure, and associated site improvements. Interior renovations include demolition, cabinetry, finish carpentry, installation of owner furnished demonstration equipment, electrical and plumbing work to connect the demonstration equipment, fire alarm, adjustment to existing electrical, plumbing and mechanical systems and equipment, patching of finishes, and painting. The outdoor structure consists of demolition of existing paving, relocation of utilities, grading, construction of a structural steel structure, reinforced and grouted concrete masonry enclsoure, metal roof, hollow metal doors and frames, reinforced concrete foundations, concrete slab, signage, finishes, and electrical and plumbing work. Site improvements consist of restriping accessible parking stalls and loading zones, site signage, extension of existing storm drain systems, construction of concrete flatwork and equipment pads, installation of owner furnished demonstration equipment on pads and building exterior, removal and replacement of existing fencing and gates, and installation of new fencing.
Posted Date
May 11, 2026
Due Date
May 28, 2026
Release: May 11, 2026
Upland Unified School District
Close: May 28, 2026
Project includes but is not limited to: interior renovations to vocational classroom N257 and storage N257B located in building N north and the construction of an adjacent outdoor structure, and associated site improvements. Interior renovations include demolition, cabinetry, finish carpentry, installation of owner furnished demonstration equipment, electrical and plumbing work to connect the demonstration equipment, fire alarm, adjustment to existing electrical, plumbing and mechanical systems and equipment, patching of finishes, and painting. The outdoor structure consists of demolition of existing paving, relocation of utilities, grading, construction of a structural steel structure, reinforced and grouted concrete masonry enclsoure, metal roof, hollow metal doors and frames, reinforced concrete foundations, concrete slab, signage, finishes, and electrical and plumbing work. Site improvements consist of restriping accessible parking stalls and loading zones, site signage, extension of existing storm drain systems, construction of concrete flatwork and equipment pads, installation of owner furnished demonstration equipment on pads and building exterior, removal and replacement of existing fencing and gates, and installation of new fencing.
Upland Unified School District
Project includes but is not limited to: changing restroom fixtures, toilet partitions, mounting heights, and clearances to improve ADA accessibility compliance, including related plumbing, finish, and accessibility upgrades as required.
Posted Date
May 11, 2026
Due Date
May 28, 2026
Release: May 11, 2026
Upland Unified School District
Close: May 28, 2026
Project includes but is not limited to: changing restroom fixtures, toilet partitions, mounting heights, and clearances to improve ADA accessibility compliance, including related plumbing, finish, and accessibility upgrades as required.
Upland Unified School District
Provide exterior paint.
Posted Date
Apr 6, 2026
Due Date
Apr 30, 2026
Release: Apr 6, 2026
Upland Unified School District
Close: Apr 30, 2026
Provide exterior paint.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $114,800, use sole source.
Coops: Lead with OMNIA Partners piggybacking; proceed if your offering is available.
Upland Unified School District, CA avoids sole-sourcing and adheres strictly to competitive bidding. Non-competitive justifications face high friction; redirect efforts to pre-competed cooperative contracts instead.
Track vendor wins and renewal opportunities
Upland Unified School District
The document comprises five distinct proposals and two formal service agreements between San Bernardino County Superintendent of Schools (SBCSS) and Upland Unified School District (UUSD). These cover various educational support services including math adoption support for 2024-2025, ELA/HSS support for late 2023, history and literacy support for 2025-2026, and arts education support spanning 2023 to 2025. The formal agreements 23/24-0270 (math teachers PD) and 23/24-0419 (arts education PD) were entered into on August 1, 2023, with specified completion dates in late 2023. Each proposal outlines specific services, dates, and costs, with individual totals ranging from $6,000 to $10,750, but no overarching total for all services.
Effective Date
Aug 1, 2023
Expires
Effective: Aug 1, 2023
Upland Unified School District
Expires:
The document comprises five distinct proposals and two formal service agreements between San Bernardino County Superintendent of Schools (SBCSS) and Upland Unified School District (UUSD). These cover various educational support services including math adoption support for 2024-2025, ELA/HSS support for late 2023, history and literacy support for 2025-2026, and arts education support spanning 2023 to 2025. The formal agreements 23/24-0270 (math teachers PD) and 23/24-0419 (arts education PD) were entered into on August 1, 2023, with specified completion dates in late 2023. Each proposal outlines specific services, dates, and costs, with individual totals ranging from $6,000 to $10,750, but no overarching total for all services.
Upland Unified School District
This document outlines an Independent Contractor Agreement between Upland Unified School District and Annie Havard for consultant services to develop and implement a Unity Program, including planning, training, and support for secondary staff, and student training to facilitate Unity Forums. The agreement, dated June 26, 2023, specifies services from July 1, 2023, to June 30, 2024, with a compensation rate of $125 per day, not to exceed $2,350. It also includes comprehensive general terms and conditions covering aspects such as indemnification, insurance, liability, confidentiality, and termination.
Effective Date
Jul 1, 2023
Expires
Effective: Jul 1, 2023
Upland Unified School District
Expires:
This document outlines an Independent Contractor Agreement between Upland Unified School District and Annie Havard for consultant services to develop and implement a Unity Program, including planning, training, and support for secondary staff, and student training to facilitate Unity Forums. The agreement, dated June 26, 2023, specifies services from July 1, 2023, to June 30, 2024, with a compensation rate of $125 per day, not to exceed $2,350. It also includes comprehensive general terms and conditions covering aspects such as indemnification, insurance, liability, confidentiality, and termination.
Upland Unified School District
This document includes an Independent Contractor Agreement between Upland Unified School District and Sean Antos for training and consultation services, with a maximum contract amount of $5,600 for work to be performed between September 10, 2024, and September 12, 2024. The services include a 2-day PREPaRE Workshop II v3 training and 8 hours of virtual consultation. The document also contains an earlier Service Proposal ($8000.00) and a Request for Board Approval/Action ($7,100.00) for a different consultant, which are not binding agreements.
Effective Date
Sep 10, 2024
Expires
Effective: Sep 10, 2024
Upland Unified School District
Expires:
This document includes an Independent Contractor Agreement between Upland Unified School District and Sean Antos for training and consultation services, with a maximum contract amount of $5,600 for work to be performed between September 10, 2024, and September 12, 2024. The services include a 2-day PREPaRE Workshop II v3 training and 8 hours of virtual consultation. The document also contains an earlier Service Proposal ($8000.00) and a Request for Board Approval/Action ($7,100.00) for a different consultant, which are not binding agreements.
See expiring contracts, renewal risk, pricing history, and competitor awards — then sync the data to your CRM.
Board meetings and strategic plans from Upland Unified School District
The Upland Unified School District's "Great 8" strategic plan aims to transform educational challenges into opportunities by engaging the entire community. It outlines a proactive strategy focused on expanding specialized opportunities for students, including initiatives such as expanded career technical education, dual language programs, STEM, a sports academy, and a teacher pathway. The plan also involves significant restructuring of schools, such as converting Upland Elementary into a TK-3 early learning campus with a Pathways Prep Academy, and Upland Junior High into a 4th-8th grade intermediate arts academy. This comprehensive strategy is designed to build up and strengthen the K-12 system, ensuring every student has access to enhanced possibilities.
The board discussed several items during the meeting, including student services and discipline matters, and approved settlements and expulsions. Presentations were given regarding Valencia Elementary School highlights, Hispanic Heritage Month projects, the Upland High School Sports Complex, and adult education programs. The board also reviewed and approved various consent calendar items, including personnel recommendations, job descriptions, and agreements with community partners. Additionally, a public hearing was held regarding the sufficiency of instructional materials, and the board took action to approve an amendment to an employment agreement and a revision to a board policy.
This Home to School Transportation Plan for Upland Unified School District outlines the transportation services provided to students, prioritizing transitional kindergarten, kindergarten, grades 1-6, low-income pupils, pupils with disabilities, and homeless children and youth, all offered at no cost. The plan details the allocation of reimbursement funds for contracted busing, salaries, benefits, fuel, and maintenance, while addressing operational challenges such as driver vacancies. It emphasizes extensive engagement with educational partners, including parents, staff, and community members, through surveys and consultations with agencies like Omnitrans and the South Coast AQMD, to inform service provision, optimize routes, and comply with environmental regulations.
This Comprehensive School Safety Plan for Valencia Elementary provides a roadmap for the 2025-2026 school year, based on a systematic review of crime and safety data. It establishes two data-driven safety goals: to sustain a campus-wide sense of safety through defined emergency plans, staff training, visitor procedure fidelity checks, perimeter security, and anti-bullying education; and to update physical resources for enhanced campus security, effective surveillance systems, and clear emergency communication.
The board received a presentation on the Multi-Tiered System of Supports (MTSS) focusing on student support models, professional team efforts, and dual enrollment initiatives. Discussions included potential opportunities for district students through partnerships with Cal State San Bernardino and considerations regarding school safety readiness. During the closed session, the board addressed personnel matters, including the appointment of a new principal, as well as labor negotiations and legal matters related to anticipated litigation. Upon reconvening in open session, the board officially approved the appointment of the principal for Pathways Preparatory Academy and voted to reject a demand for Cure and Correct.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Upland Unified School District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge