Sanitary Sewer Rehab & Repairs RFP
Posted
Sep 24, 2026
Oct 16, 2026
Furnishing all tools, materials, and labor necessary for video pre and post inspection of 10,000 LF of pipe; replacement of 4' and 5' diameter manholes; point repair of 8" diameter pipe; slip lining of 3,400 LF of 8" host pipe and 450 LF of 12" host pipe; pipe bursting of 3,700 LF of 8" host pipe; open-cut replacement of 350 LF of 8" host pipe; unclassified excavation; installing 38 LF of 10" open cut sewer pipe and 186 LF of 10" pipe in 24" bored steel casing; abandoning 223 LF of 10" pipe; right-of-way clearing, pavement removal, and sod restoration.
