CityTX
Posted
Sep 11, 2026
Oct 22, 2026
Northside High School Area - Sanitary Sewer Rehab
Work includes 190 LF install low profile concrete barriers; 333 LF low profile concrete barrier moved and reset; 190 LF remove low profile concrete barriers; 508 LF reinforced filter fabric barrier (install and remove); 810 LF filter fabric fence (install and remove); 264 LF inlet protection barrier gravel bags (install and remove); 77 SY stabilized construction access; 1 LS control of ground water; 60 LF site restoration; 2 EA build forward project identification sign; 1,734 LF cleaning 78" sanitary sewer, including manholes with normal cleaning equipment; 1,734 LF tv inspection 78" sanitary sewer and manholes; 107 CY debris removal (removal, transport, and legal disposal) from 78" sanitary sewer, including manholes. See attached file.
