Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Do not pursue; pivot immediately to a coop route. Note: A low $10,000 board approval threshold tends to trigger formal competition.
Coops: Lead with Sourcewell to bypass the $10,000 board approval and avoid formal bidding.
Township of Washington, OH: No evidence of sole source awards. Attempting a sole source justification is unlikely to succeed—deprioritize and pivot to cooperative purchasing.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Township of Washington's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Public Works Director
Trustee President
Township Administrator
Human Resources Director
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Township of Washington
The work consists of the removal and replacement of 8,900 LF of curb and 17,700 SF sidewalk including other miscellaneous items related to concrete rehabilitation.
Posted Date
Jan 16, 2026
Due Date
Feb 3, 2026
Release: Jan 16, 2026
Township of Washington
Close: Feb 3, 2026
The work consists of the removal and replacement of 8,900 LF of curb and 17,700 SF sidewalk including other miscellaneous items related to concrete rehabilitation.
AvailableTownship of Washington
The scope of work for Base Bid #1: Site Improvements Base includes site demolition and preparation for new construction, substantial grading across designated project areas, concrete installation, including roadway and curb construction, utility infrastructure, including water, sewer, and electrical, site preparation for future structural components and amenities. The scope of work planned for Base Bid #2: Building Construction includes construction of outdoor pavilion and covered canopies, a new ticket booth and restroom building. The scope of work planned for Base Bid #3 includes all landscaping elements associated with the project.
Posted Date
Oct 3, 2025
Due Date
Oct 29, 2025
Release: Oct 3, 2025
Township of Washington
Close: Oct 29, 2025
The scope of work for Base Bid #1: Site Improvements Base includes site demolition and preparation for new construction, substantial grading across designated project areas, concrete installation, including roadway and curb construction, utility infrastructure, including water, sewer, and electrical, site preparation for future structural components and amenities. The scope of work planned for Base Bid #2: Building Construction includes construction of outdoor pavilion and covered canopies, a new ticket booth and restroom building. The scope of work planned for Base Bid #3 includes all landscaping elements associated with the project.
Township of Washington
Work includes retracing of existing pavement markings with odot item 642 traffic paint at various locations includes maintenance of traffic; 44 miles of centerline 4" double yellow solid; 42 miles of centerline 4" double yellow solid/dashed; 80 miles of edge line 5" solid white; 3 miles of lane line 5" solid white/dashed; 420' of transverse line 12" white; 392' of transverse line 12" yellow; 24,380' of channelizing line; 2,585' of stop line; 4,650' of cross walk line; 305 EA lane arrow; 11 EA misc symbols and text.
Posted Date
Jun 13, 2025
Due Date
Jun 30, 2025
Release: Jun 13, 2025
Township of Washington
Close: Jun 30, 2025
Work includes retracing of existing pavement markings with odot item 642 traffic paint at various locations includes maintenance of traffic; 44 miles of centerline 4" double yellow solid; 42 miles of centerline 4" double yellow solid/dashed; 80 miles of edge line 5" solid white; 3 miles of lane line 5" solid white/dashed; 420' of transverse line 12" white; 392' of transverse line 12" yellow; 24,380' of channelizing line; 2,585' of stop line; 4,650' of cross walk line; 305 EA lane arrow; 11 EA misc symbols and text.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.