Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work consists of the removal and replacement of 8,900 LF of curb and 17,700 SF sidewalk including other miscellaneous items related to concrete rehabilitation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
2026 Concrete rehabilitation project. The project is generally described as follows: Replacement of concrete sidewalks, curbs and gutters, and concrete pavement at three school locations within the district. Work also includes asphalt demolition at the district bus barn, followed by the replacement of the surface with concrete pavement.
Posted Date
Jan 5, 2026
Due Date
Jan 22, 2026
Release: Jan 5, 2026
Close: Jan 22, 2026
2026 Concrete rehabilitation project. The project is generally described as follows: Replacement of concrete sidewalks, curbs and gutters, and concrete pavement at three school locations within the district. Work also includes asphalt demolition at the district bus barn, followed by the replacement of the surface with concrete pavement.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 140 CY excavation; 50 SF full depth rigid pavement removal and flexible replacement; 370 SF type 1, asphalt concrete surface course, pg64-22, medium traffic, driveway 6" thick, placed in 2 lifts, (448); 1,800 SF concrete driveway, 6" thick; 3 EA remove and relocate sign; 1 LS seeding and mulching; 30 CY topsoil; 8 EA catch basin adjust to grade; 1 EA catch basin minor repair; 1 EA manhole adjusted to grade; 1 EA manhole repair, major; 550 LF barrier curb, type 6, replacement, isolated.
Posted Date
Jan 15, 2026
Due Date
Jan 29, 2026
Release: Jan 15, 2026
Close: Jan 29, 2026
Work includes 140 CY excavation; 50 SF full depth rigid pavement removal and flexible replacement; 370 SF type 1, asphalt concrete surface course, pg64-22, medium traffic, driveway 6" thick, placed in 2 lifts, (448); 1,800 SF concrete driveway, 6" thick; 3 EA remove and relocate sign; 1 LS seeding and mulching; 30 CY topsoil; 8 EA catch basin adjust to grade; 1 EA catch basin minor repair; 1 EA manhole adjusted to grade; 1 EA manhole repair, major; 550 LF barrier curb, type 6, replacement, isolated.
AvailableRFP for housing rehabilitation services, providing up to $20,000 in repairs per unit for one to three-family homes.
Posted Date
-
Due Date
Dec 31, 2026
Close: Dec 31, 2026
RFP for housing rehabilitation services, providing up to $20,000 in repairs per unit for one to three-family homes.
Available2026 concrete curb and sidewalk bid, which involves the replacement of existing concrete sidewalk, concrete curb, and driveway aprons on various streets in the township.
Posted Date
Dec 21, 2025
Due Date
Jan 23, 2026
Release: Dec 21, 2025
Close: Jan 23, 2026
2026 concrete curb and sidewalk bid, which involves the replacement of existing concrete sidewalk, concrete curb, and driveway aprons on various streets in the township.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →